共 50 条
- [4] NANOSECOND-PULSE GENERATOR USING THYRISTORS INSTRUMENTS AND EXPERIMENTAL TECHNIQUES-USSR, 1971, 14 (04): : 1083 - &
- [6] STABILIZATION OF THE OPERATING POINT OF AVALANCHE TRANSISTORS IN NANOSECOND-PULSE SHAPERS. Instruments and Experimental Techniques (English Translation of Pribory I Tekhnika Eksperimenta), 1974, 17 (3 Part 1): : 763 - 764
- [7] FORCED COMMUTATION THYRISTOR BRIDGE USING PULSE TRANSFORMER. Electrical Engineering in Japan (English translation of Denki Gakkai Ronbunshi), 1986, 106 (01): : 122 - 131
- [8] Laser Markings on Transparent Materials Using Nanosecond-Pulse Laser 2018 13TH ANNUAL IEEE INTERNATIONAL CONFERENCE ON NANO/MICRO ENGINEERED AND MOLECULAR SYSTEMS (NEMS 2018), 2018, : 385 - 388
- [9] Field analysis of windings configuration influence on power losses in pulse transformer. PRZEGLAD ELEKTROTECHNICZNY, 2010, 86 (04): : 201 - 204