A heuristic scheduling algorithm for improving the duration and net present value of a project

被引:0
作者
Ulusoy, G.
Oezdamar, L.
机构
来源
International Journal of Operations & Production Management | / 15卷 / 01期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
[41]   Multi-project scheduling using an heuristic and a genetic algorithm [J].
Kumanan, S. ;
Jose, G. Jegan ;
Raja, K. .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 31 (3-4) :360-366
[42]   Heuristic Embedded Genetic Algorithm for Heterogeneous Project Scheduling Problems [J].
Mahmud, Firoz ;
Zaman, Forhad ;
Sarker, Ruhul ;
Essam, Daryl .
2020 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2020,
[43]   Multi-project scheduling using an heuristic and a genetic algorithm [J].
S. Kumanan ;
G. Jegan Jose ;
K. Raja .
The International Journal of Advanced Manufacturing Technology, 2006, 31 :360-366
[44]   A heuristic learning algorithm and its application to project scheduling problems [J].
Zamani, R ;
Shue, LY ;
Athanasiadis, L .
ASSOCIATION FOR INFORMATION SYSTEMS PROCEEDINGS OF THE AMERICAS CONFERENCE ON INFORMATION SYSTEMS, 1998, :230-232
[45]   The impact of solution representations on heuristic net present value optimization in discrete time/cost trade-off project scheduling with multiple cash flow and payment models [J].
Leyman, Pieter ;
Van Driessche, Niels ;
Vanhoucke, Mario ;
De Causmaecker, Patrick .
COMPUTERS & OPERATIONS RESEARCH, 2019, 103 :184-197
[46]   Scheduling Markovian PERT networks to maximize the net present value [J].
Creemers, Stefan ;
Leus, Roel ;
Lambrecht, Marc .
OPERATIONS RESEARCH LETTERS, 2010, 38 (01) :51-56
[47]   THE SCHEDULING OF ACTIVITIES TO MAXIMIZE THE NET PRESENT VALUE OF PROJECTS - COMMENT [J].
SEPIL, C .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 73 (01) :185-187
[48]   SCHEDULING A SINGLE-MACHINE TO MAXIMIZE NET PRESENT VALUE [J].
LAWRENCE, SR .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1991, 29 (06) :1141-1160
[49]   A scatter search heuristic for maximising the net present value of a resource-constrained project with fixed activity cash flows [J].
Vanhoucke, Mario .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (07) :1983-2001
[50]   Scheduling the construction of value and discount weighted trees for maximum net present value [J].
Grossman, P. A. ;
Brazil, M. ;
Rubinstein, J. H. ;
Thomas, D. A. .
COMPUTERS & OPERATIONS RESEARCH, 2020, 115