共 50 条
[21]
Null excavation schedule for entrance tunnel construction during colluvial deposits
[J].
1600, E-Journal of Geotechnical Engineering, 214B Engineering South, Stillwater, OK 74078, United States (19 C)
[24]
Design, Construction and Uncertainties of a Deep Excavation Adjacent to the High-Rise Building
[J].
Indian Geotechnical Journal,
2019, 49
:580-594
[25]
THE MYCENAEAN SITE OF KASTROULI, PHOKIS, GREECE: THIRD EXCAVATION SEASON, JULY 2018
[J].
MEDITERRANEAN ARCHAEOLOGY & ARCHAEOMETRY,
2022, 22 (02)
:1-21
[26]
THE MYCENAEAN SITE OF KASTROULI, PHOKIS, GREECE: SECOND EXCAVATION SEASON, JULY 2017
[J].
MEDITERRANEAN ARCHAEOLOGY & ARCHAEOMETRY,
2018, 18 (03)
:209-224
[29]
Investigation on Behavior of Rock-socketed Retaining Piles for Deep Excavation
[J].
FRACTURE AND STRENGTH OF SOLIDS VII, PTS 1 AND 2,
2011, 462-463
:825-830