PPS (Production, Planning and Control Systems) Used in an Engineering Plant.

被引:0
|
作者
Querfurt, Klaus-Peter
Hammer, Klaus
机构
来源
Werkstatt und Betrieb | 1988年 / 121卷 / 01期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
PACKAGING MATERIALS
引用
收藏
页码:31 / 34
相关论文
共 50 条
  • [31] SYSTEMS APPROACH TO AUTOMATION IN THE MODERN PLANT.
    Haupt, B.J.
    Technical Paper - Society of Manufacturing Engineers. MS, 1982,
  • [32] QUALITY CONTROL IN A CANOLA CRUSHING PLANT.
    Campbell, Stewart J.
    JAOCS, Journal of the American Oil Chemists' Society, 1984, 61 (06): : 1097 - 1101
  • [33] Delay Compensation for Control of a Multivariable Plant.
    Bassein, D.S.
    Izvestiya Vysshikh Uchebnykh Zavedenii, Elektromekhanika, 1980, (07): : 728 - 735
  • [34] Engineering changes in production: Support for Engineering Changes by Methods from the Production Planning and Control
    Cichos, Daniel
    Aurich, Jan C.
    ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb, 2015, 110 (06): : 365 - 369
  • [35] Engineering Based Approach To Optimize Electrolyzer Production Plant Planning
    Lamers, Lennart
    Jakschik, Malte
    Kuhlenkoetter, Bernd
    Yorgun, Idris
    Hypki, Alfred
    PROCEEDINGS OF THE CONFERENCE ON PRODUCTION SYSTEMS AND LOGISTICS, CPSL 2024, 2024, : 260 - 269
  • [36] PLANNING FOR CONVERSION TO DIGITAL LINES IN THE SUBSCRIBER LOOP PLANT.
    Crompton, J.Stuart
    Conference Record - Electro, 1980,
  • [37] Usual engineering features of the Conowingo dam and power plant.
    Funk, NE
    JOURNAL OF THE FRANKLIN INSTITUTE, 1927, 203 : 745 - 780
  • [38] Station Tests of Control Systems of Steam Turbines Made by Leningrad Metal Plant.
    Fragin, M.S.
    Volchegorskii, M.L.
    Teploenergetika, 1983, (01): : 16 - 19
  • [39] Engineering Works for the LG 2 Hydroelectric Power Plant.
    Boisvert, Roland
    1978, 64 (324): : 13 - 19
  • [40] ENGINEERING ASSESSMENT OF AN ADVANCED PULVERIZED COAL POWER PLANT.
    Ladino, R.H.
    Miller, E.H.
    Waltz, R.J.
    Power Engineering (Barrington, Illinois), 1982, 86 (03): : 60 - 64