GENERAL OVERHEAD DISTRIBUTION TO PROJECT COSTS.

被引:0
作者
Ringwald, Richard C. [1 ]
机构
[1] Iowa State Univ, Dep of Civil, Engineering, Ames, IA, USA, Iowa State Univ, Dep of Civil Engineering, Ames, IA, USA
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:83 / 89
相关论文
共 50 条
[41]   FORECASTING MMIC YIELDS AND COSTS. [J].
Matsuno, C.T. ;
Sharma, A.K. ;
Liu, L.C.T. ;
Esfandiari, R. .
1600, (31)
[42]   PUNCHING CUTS HOLEMAKING COSTS. [J].
Anon .
Tooling & Production, 1975, 41 (09) :54-55
[43]   REDUCING PIPE JACKING COSTS. [J].
Uffman, H.P. .
Tunnels and Tunnelling International, 1984,
[44]   CUSTOM LATHE CUTS COSTS. [J].
SCHNEIDER, ROY .
1982, V 126 (N 11) :133-134
[45]   ESTIMATING HYDRO STATION COSTS. [J].
Gordon, J.L. .
International Water Power and Dam Construction, 1982, 33 (09) :31-33
[46]   SMART TRANSMITTERS: JUSTIFYING THE COSTS. [J].
Adamski, Robert S. .
InTech, 1984, 31 (06) :63-64
[47]   Red tape and housing costs. [J].
Margulis, HL .
URBAN GEOGRAPHY, 2003, 24 (04) :357-359
[48]   Considerations on Spacelab Utilization Costs. [J].
Seibert, Guenther .
Zeitschrift fuer Flugwissenschaften und Weltraumforschung, 1980, 4 (01) :1-6
[49]   GAUGING TURNOUT PROBLEMS AND COSTS. [J].
Anon .
Railway Track and Structures, 1988, 84 (02) :31-33
[50]   The refused help to save costs. [J].
Keller, M. .
WOCHENBLATT FUR PAPIERFABRIKATION, 2010, 138 (06) :501-503