Implementing a multiskilled workforce

被引:1
|
作者
Haas, T.C. [1 ]
Rodriguez, A.M. [1 ]
Glover, R. [1 ]
Goodrum, P.M. [1 ]
机构
[1] Department of Civil Engineering, The University of Texas, Austin, TX 78712-1076, United States
关键词
Productivity - Project management - Scheduling - Strategic planning;
D O I
10.1080/01446190110050936
中图分类号
学科分类号
摘要
Recent studies show the construction industry in the USA is facing a long term labour shortage. Multiskilling has been suggested as a strategy to address this issue by utilizing existing workers more efficiently. Multiskilling decreases the number of workers hired for a project and can improve productivity. Additional benefits include higher income and increased employability of the workforce. To take full advantage of these benefits, the workforce strategy and the planning and scheduling processes of a construction project must be adapted to use multiskilling effectively and efficiently. The multiskilled workforce should be scheduled and organized to maximize the duration of employment for workers, reduce the overall labour requirements and cover the skills combinations required by the project. This research synthesizes and formalizes the methods that successful construction companies are currently applying to implement a multiskilled workforce. A methodology for implementing multiskilling is outlined as well.
引用
收藏
页码:633 / 641
相关论文
共 50 条
  • [1] Assignment and allocation optimization of partially multiskilled workforce
    Gomar, JE
    Haas, CT
    Morton, DP
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2002, 128 (02): : 103 - 109
  • [3] Multiskilled Workforce Planning: A Case from the Construction Industry
    Nasirian, Araz
    Abbasi, Babak
    Cheng, T. C. E.
    Arashpour, Mehrdad
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2022, 148 (05)
  • [4] Multiskilled workforce staffing and scheduling: A logic-based Benders' decomposition approach
    Nasirian, Araz
    Zhang, Lele
    Costa, Alysson M.
    Abbasi, Babak
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2025, 323 (01) : 20 - 33
  • [5] Multiskilled Project Management Workforce Assignment across Multiple Projects Regarding Competency
    Sarihi, Mohsen
    Shahhosseini, Vahid
    Banki, Mohammad Taghi
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2020, 146 (12)
  • [6] Staffing a multiskilled workforce with varying levels of productivity: An analysis of cross-training policies
    Brusco, MJ
    Johns, TR
    DECISION SCIENCES, 1998, 29 (02) : 499 - 515
  • [7] Multiskilled workforce management by utilizing closed chains under uncertain demand: A retail industry case
    Augusto Henao, Cesar
    Carlos Munoz, Juan
    Carlos Ferrer, Juan
    COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 127 : 74 - 88
  • [8] Piecewise Linear Model for Multiskilled Workforce Scheduling Problems considering Learning Effect and Project Quality
    Qin, Shujin
    Liu, Shixin
    Kuang, Hanbin
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2016, 2016
  • [9] Multiskilled workers
    Barnes, J
    PROFESSIONAL ENGINEERING, 2002, 15 (20) : 19 - 19
  • [10] A multiobjective integrated multiproject scheduling and multiskilled workforce assignment model considering learning effect under uncertainty
    Hematian, Milad
    Seyyed Esfahani, Mir Mehdi
    Mahdavi, Iraj
    Mahdavi-Amiri, Nezam
    Rezaeian, Javad
    COMPUTATIONAL INTELLIGENCE, 2020, 36 (01) : 276 - 296