Cost Planning in Tool Construction: Planning by Way of Multivariate Methods.

被引:0
|
作者
Eversheim, Walter
Deich, Axel
机构
来源
VDI-Z | 1987年 / 129卷 / 04期
关键词
COST ACCOUNTING;
D O I
暂无
中图分类号
学科分类号
摘要
Work scheduling in tool construction (dies and molds) is aimed at establishing process sequences for the production of hollow shape-type tools which are optimum in terms of time and costs. This planning task turns out to be very complex due to the great variety of possible manufacturing methods and due to technological, economic and organizational marginal conditions. A study for forging dies resulted in differences in the scheduled production costs of up to 50%. Only inadequate methods are available to date for carrying out cost optimum planning. Based on the example of die production the paper presents some initial steps towards a cost reduction in hollow shape tool construction.
引用
收藏
页码:46 / 52
相关论文
共 50 条
  • [1] CONSTRUCTION PLANNING AND METHODS
    ROSE, JJ
    DYE, FL
    WATSON, WB
    CROOK, LT
    TRANSACTIONS OF THE AMERICAN SOCIETY OF CIVIL ENGINEERS, 1949, 114 : 773 - 796
  • [2] STRATEGIC PLANNING: ITS PURPOSE, VALUE, AND METHODS.
    Hensey, Melville
    Journal of Management in Engineering, 1986, 2 (04) : 213 - 221
  • [3] Planning in intelligent systems: Aspects, motivations, and methods.
    Chechile, Richard
    JOURNAL OF MATHEMATICAL PSYCHOLOGY, 2007, 51 (02) : 132 - 132
  • [4] Qualitative methods. Planning, implementation and ethical reflection
    Mangset, Marte
    TIDSSKRIFT FOR SAMFUNNSFORSKNING, 2020, 61 (04): : 414 - 416
  • [5] CONSTRUCTION PLANNING AND METHODS - DISCUSSION
    KRAMER, H
    NICHOLS, PG
    PILLSBURY, GB
    DAVIDSON, KSM
    JUSTIN, JD
    MCALPINE, WH
    COVELL, WER
    HOBBS, WH
    HILL, H
    REYNOLDS, KC
    TSCHEBOTARIOFF, GP
    DOHN, CW
    HORTON, DF
    FUCIK, EM
    ROMANOWITZ, CM
    KAZMANN, RG
    MASSEY, GB
    ALLAN, W
    BAKHMETEFF, BA
    SHELDON, RC
    EDWARDS, FW
    CEDERGREN, HR
    COLE, HO
    ERICKSON, OP
    JARVIS, CS
    MARSTON, A
    KIRKPATRICK, RZ
    SHANKLAND, E
    MCNOWN, JS
    LITTLE, HH
    CASAGRANDE, A
    STRATTON, JH
    JOHNSON, RP
    STEINBORN, SO
    BROWN, FS
    MEYERS, JS
    SCHULTZ, EA
    LEE, CA
    BOWERS, CE
    REEVES, JE
    BOURQUARD, EH
    BINGER, WV
    THOMPSON, TF
    CASAGRANDE, A
    SHANNON, WL
    ROSE, JJ
    DYE, FL
    WATSON, WB
    CROOK, LT
    TRANSACTIONS OF THE AMERICAN SOCIETY OF CIVIL ENGINEERS, 1949, 114 : 797 - 906
  • [6] Planning methods for repetitive construction
    Teixeira, JMC
    Couto, JP
    XXX IAHS WORLD CONGRESS ON HOUSING, HOUSING CONSTRUCTION: AN INTERDISCIPLINARY TASK, VOLS 1-3, 2002, : 1223 - 1229
  • [7] LOW-COST COMPUTER METHODS AS A PRODUCTION PLANNING TOOL.
    Heward, J.H.
    Production Engineer (London), 1975, 54 (10): : 543 - 547
  • [8] PLANNING - WAY OF SHAPING FUTURE - THOUGHTS ON PLANNING METHODS AND SYSTEMS
    HAUSLER, J
    MANAGEMENT INTERNATIONAL REVIEW, 1968, 8 (2-3) : 12 - 21
  • [9] Cost planning and Construction accounting.
    不详
    BAUINGENIEUR, 2010, 85 : A10 - A10
  • [10] FINISHING WORKS IN CONSTRUCTION - COST PLANNING
    Galic, Mario
    Dolacek-Alduk, Zlata
    Burilo, Dalibor
    Knezevic, Antonio
    ELECTRONIC JOURNAL OF THE FACULTY OF CIVIL ENGINEERING OSIJEK-E-GFOS, 2012, 4 : 93 - 101