This paper outlines the cable erection of the Shimotsui-Seto Bridge, which was characterized by the following two aspects. The pilot rope crossing was carried out using a large-sized floating crane so as not to interrupt a shipping fairway. The main cable was erected by a new air-spinning method which spins the wire under wire tension lower than free-hung tension.