PART 1 - NEW TECHNOLOGY REQUIRED TO OPERATE TRAILBLAZER SYSTEM.

被引:0
|
作者
Remington, W.M.
Hanig, J.L.
机构
来源
Pipe line industry Houston, Tex. | 1984年 / 61卷 / 02期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
Innovations developed to overcome radical elevation changes and needs of three different owners include: overpressure protection, automatic controls and transient flow software. A description is provided of a 36-inch (910-mm) Trailblazer pipe line system composed of three segments: Overthrust, Wyoming Interstate Company (WIC), and Trailblazer.
引用
收藏
页码:29 / 30
相关论文
共 50 条
  • [1] NEW TECHNOLOGY REQUIRED TO OPERATE TRAILBLAZER SYSTEM.
    Remington, W.M.
    Hanig, J.L.
    1600, (61):
  • [2] NEW TECHNOLOGY REQUIRED TO OPERATE TRAILBLAZER SYSTEM .1.
    REMINGTON, WM
    HANIG, JL
    PIPE LINE INDUSTRY, 1984, 61 (02): : 29 - 30
  • [3] NEW TECHNOLOGY REQUIRED TO OPERATE TRAILBLAZER SYSTEM .2.
    REMINGTON, WM
    HANIG, JL
    PIPE LINE INDUSTRY, 1984, 61 (03): : 33 - &
  • [4] The hemostatic system. 1st Part
    Barcellona, Doris
    Marongiu, Francesco
    JOURNAL OF PEDIATRIC AND NEONATAL INDIVIDUALIZED MEDICINE, 2020, 9 (01):
  • [5] APPLICATION OF THE SI METRIC SYSTEM: PART 1 - THE BASIC SYSTEM.
    Campbell, John M.
    Campbell, Robert A.
    JPT, Journal of Petroleum Technology, 1985, 37 (09): : 1415 - 1419
  • [6] NEW COMPUTER IDEAS USED ON TRAILBLAZER SYSTEM
    BUCHLER, GM
    PIPE LINE INDUSTRY, 1983, 59 (06): : 25 - &
  • [7] NEW NDT TECHNOLOGY USED ON OIL RECOVERY SYSTEM.
    Anon
    Welding Journal (Miami, Fla), 1986, 65 (10): : 57 - 58
  • [8] SIMPLE WINDOWING SYSTEM. PART 1: BASIC PRINCIPLES.
    Webster, Bruce
    Byte, 1986, 11 (03): : 129 - 133
  • [9] Failures of the global measurement system. Part 1: the case of chemistry
    Gary Price
    Accreditation and Quality Assurance, 2010, 15 : 421 - 427
  • [10] Failures of the global measurement system. Part 1: the case of chemistry
    Price, Gary
    ACCREDITATION AND QUALITY ASSURANCE, 2010, 15 (07) : 421 - 427