INSTALLATION OF 115 kV OIL-FILLED SUBMARINE CABLE BETWEEEN MARGARITA ISLAND AND MAINLAND VENEZUELA.

被引:0
|
作者
Ledezma, Olazhir R.
Gomez, Jose L.
Tsumoto, Mitsuo
Marquez, Ruben
机构
来源
| 1979年
关键词
Engineering Village;
D O I
暂无
中图分类号
学科分类号
摘要
ELECTRIC POWER TRANSMISSION - Venezuela - INSULATING OIL - Applications
引用
收藏
相关论文
共 50 条
  • [31] Long-term reliability testing of 500 kV DC PPLP-insulated oil-filled cable and accessories
    Nakiri, T
    Maekawa, Y
    Takashima, H
    Imajo, T
    Hirota, H
    Ishii, K
    Nakao, Y
    Shimoda, M
    IEEE TRANSACTIONS ON POWER DELIVERY, 1999, 14 (02) : 319 - 326
  • [32] DEVELOPMENT OF 500 KV SELF-CONTAINED OIL-FILLED CABLE FOR OUTGOING LINES FROM POWER-PLANTS
    YAMAMOTO, T
    NAGAMI, H
    SHIROYA, M
    MATSUURA, K
    MATSUI, T
    IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1973, PA92 (02): : 760 - 768
  • [34] 69-KV HIGH-PRESSURE OIL-FILLED PIPE-TYPE SUBMARINE LINES TO OFFSHORE DRILLING ISLANDS
    TOROK, W
    IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1969, PA88 (04): : 334 - &
  • [35] COMPLETION OF DIRECT DUCT WATER COOLED 154-KV SELF-CONTAINED OIL-FILLED CABLE SYSTEM
    NAGAHAMA, I
    MEMITA, N
    NAGASAKI, S
    NODA, N
    INOUE, H
    IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1980, 99 (02): : 667 - 677
  • [36] DEVELOPMENT OF NEW 500KV LAMINATED PAPER INSULATED SELF-CONTAINED OIL-FILLED CABLE AND ITS ACCESSORIES
    WATANABE, Y
    FUKAGAWA, H
    IWATA, Z
    HATA, R
    YOSHIDA, S
    SAITOH, H
    FUJIWARA, Y
    IEEE TRANSACTIONS ON POWER DELIVERY, 1988, 3 (01) : 47 - 61
  • [37] COMPLETION OF DIRECT DUCT WATER COOLED 154KV SELF-CONTAINED OIL-FILLED CABLE SYSTEM.
    Nagahama, I.
    Memita, N.
    Nagasaki, S.
    Noda, N.
    Inoue, H.
    1979,
  • [38] DEVELOPMENT OF +/-400 KV-+/-600-KV HIGH AND MEDIUM-PRESSURE OIL-FILLED PAPER INSULATED DC POWER CABLE SYSTEM
    BAHDER, G
    EAGER, GS
    SEMAN, GW
    FISCHER, FE
    CHU, H
    IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1978, 97 (06): : 2045 - 2056
  • [39] ROLE OF METAL DEBRIS IN THE PERFORMANCE OF STOP-JOINTS AS USED IN 275 KV AND 400 KV SELF-CONTAINED OIL-FILLED CABLE CIRCUITS
    GIBBONS, JAM
    SAUNDERS, BL
    STANNETT, AW
    IEE PROCEEDINGS-C GENERATION TRANSMISSION AND DISTRIBUTION, 1980, 127 (06) : 406 - 419
  • [40] DISCUSSION OF 69-KV HIGH-PRESSURE OIL-FILLED PIPE-TYPE SUBMARINE LINES TO OFFSHORE DRILLING ISLANDS
    HATCHER, CT
    RALSTON, P
    MERRELL, EJ
    CHU, SC
    TOROK, W
    IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1969, PA88 (04): : 339 - &