INSTALLATION OF 115 kV OIL-FILLED SUBMARINE CABLE BETWEEEN MARGARITA ISLAND AND MAINLAND VENEZUELA.

被引:0
|
作者
Ledezma, Olazhir R.
Gomez, Jose L.
Tsumoto, Mitsuo
Marquez, Ruben
机构
来源
| 1979年
关键词
Engineering Village;
D O I
暂无
中图分类号
学科分类号
摘要
ELECTRIC POWER TRANSMISSION - Venezuela - INSULATING OIL - Applications
引用
收藏
相关论文
共 50 条
  • [1] INSTALLATION OF 115 KV OIL-FILLED SUBMARINE CABLE BETWEEN MARGARITA ISLAND AND MAINLAND VENEZUELA
    LEDEZMA, O
    MARQUEZ, R
    GOMEZ, JL
    TSUMOTO, M
    IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1979, 98 (04): : 1139 - 1139
  • [2] 275 kV OIL-FILLED SUBMARINE CABLE INSTALLATION IN HONG KONG.
    Yee, E.L.Y.
    Kan, C.H.
    Eguchi, Kikuo
    Murakami, Kaihei
    Suzuki, Kenshi
    1983,
  • [3] 230 KV SELF-CONTAINED OIL-FILLED CABLE LINE INSTALLED UNDERNEATH A BRIDGE LOCATED IN MARACAIBO, VENEZUELA.
    Marquez, R.D.
    Ledezma, O.R.
    Noda, N.
    Kuki, H.
    Radiophysics and Quantum Electronics (English Translation of Izvestiya Vysshikh Uchebnykh Zavedenii, Radiofizika), 1980,
  • [4] Development of 500 kV dc PPLP-insulated oil-filled submarine cable
    Fujimori, A
    Fujii, K
    Takashima, H
    Suzuki, H
    Mitani, M
    Fujii, O
    Shigetoshi, I
    Shimada, M
    ELECTRICAL ENGINEERING IN JAPAN, 1997, 120 (03) : 29 - 41
  • [5] Development of 500 kV DC PPLP-insulated oil-filled submarine cable
    Fujimori, A
    Tanaka, T
    Takashima, H
    Imajo, T
    Hata, R
    Tanabe, T
    Yoshida, S
    Kakihana, T
    IEEE TRANSACTIONS ON POWER DELIVERY, 1996, 11 (01) : 43 - 50
  • [6] 500 KV OIL-FILLED CABLE INSTALLED ON BRIDGES
    MINEMURA, S
    MAEKAWA, Y
    IEEE TRANSACTIONS ON POWER DELIVERY, 1990, 5 (02) : 840 - 845
  • [7] SELF-CONTAINED OIL-FILLED CABLE INSTALLATION DESIGN AND TECHNIQUES
    ARKELL, CA
    IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1977, 96 (04): : 1065 - 1065
  • [8] DIRECT BURIED INSTALLATION OF 115 KV SELF-CONTAINED MEDIUM PRESSURE OIL FILLED CABLE
    WHITTEN, GW
    WATKINS, RHW
    SUBACH, A
    IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1972, PA91 (03): : 1036 - &
  • [9] PLANNING AND INSTALLATION OF THE 138 KV SOUTH PADRE ISLAND SUBMARINE CABLE
    COOPER, JH
    POLASEK, MJ
    IEEE TRANSACTIONS ON POWER DELIVERY, 1993, 8 (04) : 1675 - 1681
  • [10] Dynamic Simulation of Running Test to Long-Distance 500kV Oil-filled Submarine Cable
    Ming, Lei
    Jiang, Zeng
    Gang, Liu
    ICPADM 2009: PROCEEDINGS OF THE 9TH INTERNATIONAL CONFERENCE ON PROPERTIES AND APPLICATIONS OF DIELECTRIC MATERIALS, VOLS 1-3, 2009, : 176 - 179