Modeling and implementation of a distributed shop floor management and control system
被引:0
作者:
Liu, Shiping
论文数: 0引用数: 0
h-index: 0
机构:
Sch. of Mech. Sci. and Eng., Huazhong Univ. of Sci. and Technol., Wuhan 430074, ChinaSch. of Mech. Sci. and Eng., Huazhong Univ. of Sci. and Technol., Wuhan 430074, China
Liu, Shiping
[1
]
Rao, Yunqing
论文数: 0引用数: 0
h-index: 0
机构:
Sch. of Mech. Sci. and Eng., Huazhong Univ. of Sci. and Technol., Wuhan 430074, ChinaSch. of Mech. Sci. and Eng., Huazhong Univ. of Sci. and Technol., Wuhan 430074, China
Rao, Yunqing
[1
]
Zhang, Jie
论文数: 0引用数: 0
h-index: 0
机构:
Sch. of Mech. Sci. and Eng., Huazhong Univ. of Sci. and Technol., Wuhan 430074, ChinaSch. of Mech. Sci. and Eng., Huazhong Univ. of Sci. and Technol., Wuhan 430074, China
Zhang, Jie
[1
]
Li, Peigen
论文数: 0引用数: 0
h-index: 0
机构:
Sch. of Mech. Sci. and Eng., Huazhong Univ. of Sci. and Technol., Wuhan 430074, ChinaSch. of Mech. Sci. and Eng., Huazhong Univ. of Sci. and Technol., Wuhan 430074, China
Li, Peigen
[1
]
机构:
[1] Sch. of Mech. Sci. and Eng., Huazhong Univ. of Sci. and Technol., Wuhan 430074, China
来源:
Chinese Journal of Mechanical Engineering (English Edition)
|
2002年
/
15卷
/
03期
关键词:
Agile manufacturing systems - Control systems - Management - Production - Scheduling - Software prototyping;
D O I:
10.3901/cjme.2002.03.213
中图分类号:
学科分类号:
摘要:
Adopting distributed control architecture is the important development direction for shop floor management and control system, is also the requirement of making it agile, intelligent and concurrent. Some key problems in achieving distributed control architecture are researched. An activity model of shop floor is presented as the requirement definition of the prototype system. The multi-agent based software architecture is constructed. How the core part in shop floor management and control system, production plan and scheduling is achieved. The cooperation of different agents is illustrated. Finally, the implementation of the prototype system is narrated.