When high-voltage overhead lines are modified or erected, it is frequently necessary to maintain the supply of electricity via existing lines, even though work is being carried out on these lines. In such instances or in the event of breakdowns, a substitute line must be provided which takes over the transport of electrical energy for a limited period. (Author abstract).