A pile test program was used to finalize the foundation design for railroad bridge piers founded on H-bearing piles driven through alluvial and glaciofluvial deposits into bedrock of the Pennsylvanian system. Twenty-four test piles were driven for length determination and 14 piles were extracted to check for damage during driving. The design bearing capacity was verified with 10 static load tests.