共 16 条
- [1] Bolt Preload Reduction of Pipe Flange Connections after Plant Shutdown PROCEEDINGS OF THE ASME PRESSURE VESSELS AND PIPING CONFERENCE, PVP 2012, VOL 2, 2012, : 183 - 191
- [3] Finite element simulation of bolt-up process of pipe flange connections JOURNAL OF PRESSURE VESSEL TECHNOLOGY-TRANSACTIONS OF THE ASME, 2001, 123 (03): : 282 - 287
- [4] Stress analysis and determination of bolt preload in pipe flange connections with gaskets under internal pressure JOURNAL OF PRESSURE VESSEL TECHNOLOGY-TRANSACTIONS OF THE ASME, 2002, 124 (04): : 385 - 396
- [5] EFFECTS OF SCATTER IN AXIAL BOLT FORCE ON THE SEALING PERFORMANCE OF PIPE FLANGE CONNECTIONS AT ELEVATED TEMPERATURE ASME PRESSURE VESSELS AND PIPING CONFERENCE - 2009, VOL 2, 2010, : 139 - 147
- [6] Effects of Scatter in Bolt Preload on the Sealing Performance of Pipe Flange Connections Under Internal Pressure (Case where the nominal diameter of pipe flange connection is 20") PROCEEDINGS OF THE ASME PRESSURE VESSELS AND PIPING CONFERENCE 2010, VOL 2: COMPUTER TECHNOLOGY AND BOLTED JOINTS, 2010, : 155 - 163
- [7] A DETERMINATION METHOD OF BOLT PRELOAD FOR BOLTED PIPE FLANGE CONNECTIONS WITH METAL GASKETS UNDER INTERNAL PRESSURE ASME PRESSURE VESSELS AND PIPING CONFERENCE - 2015, VOL 2, 2015,
- [8] Finite element simulation of bolt-up process of pipe flange connections with spiral wound gasket JOURNAL OF PRESSURE VESSEL TECHNOLOGY-TRANSACTIONS OF THE ASME, 2003, 125 (04): : 371 - 378
- [10] EFFECT OF SCATTER IN AXIAL BOLT FORCE ON THE SEALING PERFORMANCE OF 20" INCH PIPE FLANGE CONNECTIONS WITH CSG UNDER INTERNAL PRESSURE ASME PRESSURE VESSELS AND PIPING CONFERENCE - 2015, VOL 2, 2015,