HOW TO CONTRACT WITH CADD.

被引:0
作者
Stasiowski, Frank
机构
来源
Consulting engineer Barrington | 1984年 / 62卷 / 05期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
Five criteria are given to evaluate whether CADD has a positive or negative impact on contractual procedures. An hourly contract, a cost-plus-fixed-fee contract, or reimbursement on an hourly basis simply recovers investment costs in the equipment while reducing the number of hours to be billed to a client. A shift from 'labor intensive' to 'value/results' mentality will allow design firms to get a profit from their CADD systems.
引用
收藏
页码:70 / 71
相关论文
empty
未找到相关数据