DEVELOPMENT OF 900 MW COAL-FIRED GENERATING UNITS.

被引:0
|
作者
Burbridge, R.N. [1 ]
机构
[1] CEGB, Barnwood, Engl, CEGB, Barnwood, Engl
来源
Power Engineering Journal | 1988年 / 2卷 / 03期
关键词
ELECTRIC POWER PLANTS - Costs - STEAM POWER PLANTS;
D O I
10.1049/pe:19880028
中图分类号
学科分类号
摘要
The CEGB now has 64 large generating units of 500 Mw or 660 Mw which are fossil-fueled. These units form the backbone of the British power system but they are now of relatively aged designs. Following a review, it was decided to increase unit size of new generators to 900 Mw. This article presents a review of the project.
引用
收藏
页码:147 / 154
相关论文
共 50 条
  • [1] COMPONENT FAILURE AND REPAIR DATA FOR COAL-FIRED POWER UNITS.
    Derdiger, J.A.
    Bhatt, K.M.
    Siegfriedt, W.E.
    Electric Power Research Institute, Advanced Power Systems Division, (Report) EPRI AP, 1981,
  • [2] Cost control of 600 MW coal-fired units denitration based on LCA
    Wang, Wenhuan
    Pan, Weiguo
    Hu, Guoxin
    ENVIRONMENTAL ENGINEERING, PTS 1-4, 2014, 864-867 : 357 - +
  • [3] Increasing Generation Ramp Rate at Morgantown Generating Station's Coal-Fired Units
    Andrasik, Donald
    McNulty, John
    Gay, John
    Labbe, Don
    POWER, 2011, 155 (02) : 30 - 35
  • [4] Economic Analysis of Peaking Regulation of Coal-fired Generating Units Under Big Data
    Yang Z.
    Li K.
    Wang N.
    Li R.
    Jin Z.
    Yang M.
    Guo X.
    Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2019, 39 (16): : 4808 - 4818
  • [5] AERMOD performance evaluation for three coal-fired electrical generating units in Southwest Indiana
    Frost, Kali D.
    JOURNAL OF THE AIR & WASTE MANAGEMENT ASSOCIATION, 2014, 64 (03) : 280 - 290
  • [6] REDUCTION OF BOILER FEED PUMP NOISE IN AN 800 MW COAL-FIRED GENERATING UNIT.
    Thompson, A.R.
    Hoover, R.M.
    1978,
  • [7] REDUCTION OF BOILER FEED PUMP NOISE IN AN 800 MW COAL-FIRED GENERATING-UNIT
    THOMPSON, AR
    HOOVER, RM
    IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1979, 98 (04): : 1153 - 1157
  • [8] System Integration and Flowsheet Optimization of 1000 MW Coal-fired Supercritical Power Generation Units
    Huang, Shengwei
    Xu, Gang
    Yang, Yongping
    Zhang, Chenxu
    Wang, Ligang
    Wang, Ningling
    Yang, Zhiping
    INTERNATIONAL CONFERENCE ON APPLIED ENERGY, ICAE2014, 2014, 61 : 1816 - 1819
  • [10] Thermoeconomic optimization of a 1000 MW coal-fired unit
    Cheng, Wei-Liang
    Ji, Hui
    Kung Cheng Je Wu Li Hsueh Pao/Journal of Engineering Thermophysics, 2015, 36 (02): : 239 - 242