Responsiveness of Gas and Residual Oil Fuel-fired 800 MW Power Unit Operating on Sliding Pressure.

被引:0
|
作者
Doverman, G.I.
Gonoboblev, A.S.
Gombolevskii, V.I.
机构
来源
Teploenergetika | 1985年 / 04期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
3
引用
收藏
页码:29 / 32
相关论文
共 17 条
  • [1] Experience of Operation of Additional Protective Waterwalls of Gas and Residual Oil Fuel-fired Boilers.
    Myakas, V.I.
    Shitsman, M.E.
    Lyutkus, R.R.
    Satkauskas, S.E.
    Midler, L.S.
    Teploenergetika, 1982, (04): : 60 - 62
  • [2] New Design of Gas and Residual Oil-Fired Boiler Unit for a 300 MW Power Plant Unit.
    Parshin, A.A.
    Levchenko, G.I.
    Khristich, L.M.
    Zaraiskii, S.I.
    Shleifer, B.M.
    Konashev, S.L.
    Energomashinostroenie, 1979, (01): : 14 - 17
  • [3] Operating Conditions in Starting Gas and Oil-fired 800 MW Monoblocks at Uglegorsk State District Power Plant.
    Avrutskii, G.D.
    Doverman, G.I.
    Ostrovetskii, R.M.
    Plotkin, E.R.
    Shmukler, B.I.
    Gombolevskii, V.I.
    Gonoboblev, A.S.
    Krasantsov, V.N.
    Matushevskii, E.V.
    Nakhimov, V.I.
    Skopylatov, V.M.
    Tupikin, A.A.
    Teploenergetika, 1981, (09): : 36 - 39
  • [4] Bringing an 800-MW Single Power Plant Unit up to the Live Steam Rated Pressure.
    Gombolevskii, V.I.
    Gonoboblev, A.S.
    Krasantsov, V.N.
    Avrutskii, G.D.
    Doverman, G.I.
    Ostrovetskii, R.M.
    Teploenergetika, 1981, (02): : 36 - 39
  • [5] Experience of Adjustment of Automatic Control System of 300 MW Power Unit With Sliding Initial Steam Pressure.
    Ivanov, V.A.
    Shtepa, V.G.
    Mikhailov, S.Ya.
    Popov, V.E.
    Energomashinostroenie, 1977, (12): : 31 - 33
  • [6] Extension of the Arzberg Power Plant by Natural Gas/Oil Fired 200 Mw Unit.
    Steckel, Horst
    Energie, 1974, 26 (03): : 88 - 96
  • [7] NON-LINEAR MATHEMATICAL-MODEL OF A GAS-FIRED AND OIL-FIRED 800 MW BOILER-TURBINE UNIT
    DOVERMAN, GI
    BUKSHTEIN, II
    GOMBOLEVSKII, VI
    MANUCHAROVA, GV
    MIRONOVA, VA
    THERMAL ENGINEERING, 1981, 28 (06) : 322 - 326
  • [8] Specific Features of the Starting Scheme of the Gas and Residual Oil-fired 800 MW Monoblock and Results of Its Application.
    Shmukler, B.I.
    Doverman, G.I.
    Ostrovetskii, R.M.
    Gombolevskii, V.I.
    Krasantsov, V.N.
    Gonoboblev, A.S.
    Teploenergetika, 1981, (01): : 32 - 36
  • [9] An analysis of problems arising during operation of the Perm district power plant 800-MW power unit at sliding pressure
    Avrutsky G.D.
    Zakharov A.E.
    Sargsyan V.A.
    Frolov M.S.
    Schwartz A.L.
    Adamov A.S.
    Therm. Eng., 9 (615-620): : 615 - 620
  • [10] PLANNING AND OPERATING PERFORMANCE OF 600 MW COAL AND OIL DUAL-FIRED BOILER FOR A SUPERCRITICAL SLIDING PRESSURE OPERATION.
    Toda, Hiromichi
    Yamanaka, Takatomo
    Morimoto, Makoto
    Sakai, Masayasu
    Nakashima, Fumiya
    Sada, Tetsuo
    Hashimoto, Takao
    Takahira, Yukimi
    1600, (22):