共 17 条
- [1] Experience of Operation of Additional Protective Waterwalls of Gas and Residual Oil Fuel-fired Boilers. Teploenergetika, 1982, (04): : 60 - 62
- [2] New Design of Gas and Residual Oil-Fired Boiler Unit for a 300 MW Power Plant Unit. Energomashinostroenie, 1979, (01): : 14 - 17
- [3] Operating Conditions in Starting Gas and Oil-fired 800 MW Monoblocks at Uglegorsk State District Power Plant. Teploenergetika, 1981, (09): : 36 - 39
- [4] Bringing an 800-MW Single Power Plant Unit up to the Live Steam Rated Pressure. Teploenergetika, 1981, (02): : 36 - 39
- [5] Experience of Adjustment of Automatic Control System of 300 MW Power Unit With Sliding Initial Steam Pressure. Energomashinostroenie, 1977, (12): : 31 - 33
- [6] Extension of the Arzberg Power Plant by Natural Gas/Oil Fired 200 Mw Unit. Energie, 1974, 26 (03): : 88 - 96
- [8] Specific Features of the Starting Scheme of the Gas and Residual Oil-fired 800 MW Monoblock and Results of Its Application. Teploenergetika, 1981, (01): : 32 - 36
- [9] An analysis of problems arising during operation of the Perm district power plant 800-MW power unit at sliding pressure Therm. Eng., 9 (615-620): : 615 - 620