Scheduling of a two-machine flowshop with travel time between machines

被引:0
|
作者
Panwalkar, S.S. [1 ]
机构
[1] Texas Tech Univ, Lubbock, United States
来源
Journal of the Operational Research Society | 1991年 / 42卷 / 07期
关键词
Constructive Algorithms - FMS - Two Machine Flowshop Problem;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:609 / 613
相关论文
共 50 条
  • [41] A two-machine flowshop makespan scheduling problem with deteriorating jobs
    Lee, Wen-Chiung
    Wu, Chin-Chia
    Wen, Chien-Chih
    Chung, Yu-Hsiang
    COMPUTERS & INDUSTRIAL ENGINEERING, 2008, 54 (04) : 737 - 749
  • [42] Makespan minimization in the two-machine flowshop batch scheduling problem
    Cheng, TCE
    Lin, BMT
    Toker, A
    NAVAL RESEARCH LOGISTICS, 2000, 47 (02) : 128 - 144
  • [43] Bicriteria two-machine flowshop scheduling: approximation algorithms and their limits
    Jiang, Xiaojuan
    Lee, Kangbok
    Pinedo, Michael L.
    JOURNAL OF SCHEDULING, 2024, 27 (01) : 61 - 86
  • [44] An FPTAS for scheduling a two-machine flowshop with one unavailability interval
    Ng, CT
    Kovalyov, MY
    NAVAL RESEARCH LOGISTICS, 2004, 51 (03) : 307 - 315
  • [45] Makespan minimization in the two-machine flowshop batch scheduling problem
    Cheng, T.C.E.
    Lin, B.M.T.
    Toker, A.
    2000, John Wiley & Sons Inc, New York, NY, United States (47)
  • [46] Two-machine flowshop scheduling to minimize the number of tardy jobs
    Gupta, JND
    Hariri, AMA
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1997, 48 (02) : 212 - 220
  • [47] Two-machine flowshop scheduling problem with coupled-operations
    Meziani, Nadjat
    Oulamara, Ammar
    Boudhar, Mourad
    ANNALS OF OPERATIONS RESEARCH, 2019, 275 (02) : 511 - 530
  • [48] An improved heuristic for two-machine flowshop scheduling with an availability constraint
    Cheng, TEC
    Wang, GQ
    OPERATIONS RESEARCH LETTERS, 2000, 26 (05) : 223 - 229
  • [49] Bicriteria two-machine flowshop scheduling: approximation algorithms and their limits
    Xiaojuan Jiang
    Kangbok Lee
    Michael L. Pinedo
    Journal of Scheduling, 2024, 27 : 61 - 86
  • [50] A two-machine flowshop scheduling problem with precedence constraint on two jobs
    Shuenn-Ren Cheng
    Yunqiang Yin
    Chih-Hou Wen
    Win-Chin Lin
    Chin-Chia Wu
    Jun Liu
    Soft Computing, 2017, 21 : 2091 - 2103