共 50 条
[33]
Risk-Based Programs, Tools, and Techniques: ARE YOU AWARE OF THE VARIOUS RISK-ASSESSING METHODS TO KEEP YOUR LAB SAFE?
[J].
Lab Manager,
2022, 17 (05)
:38-40
[36]
Methodology to predict the initiation of multiple transverse fractures from horizontal wellbores
[J].
JOURNAL OF CANADIAN PETROLEUM TECHNOLOGY,
2001, 40 (10)
:68-75
[37]
Estimating maximum temperatures attained during fires in building stoneworks by thermoluminescence: A case study from Uncastillo, Saragossa (Spain)
[J].
Sanjurjo-Sanchez, J. (jsanjurjo@udc.es),
1600, Henan University (13)
[40]
Gain More from PUE: Assessing Data Center Infrastructure Power Adaptability
[J].
ENERGY EFFICIENT DATA CENTERS (E2DC 2014),
2015, 8945
:152-166