共 50 条
- [11] OBJECTIVES AND OPERATING EXPERIENCE OF A-1 NUCLEAR-POWER PLANT KERNENERGIE, 1976, 19 (02): : 51 - 54
- [13] Thermal Diagram of the Turbine Unit of a 1000 MW Nuclear Power Plant. Teploenergetika, 1982, (04): : 24 - 27
- [14] COOLING WATER SYSTEM CONTRACT AND CONSTRUCTION FOR THE SEABROOK NUCLEAR POWER PLANT. Underground Space, 1984, 8 (5-6): : 341 - 344
- [15] OPERATING EXPERIENCE AT IKATA NUCLEAR-POWER PLANT JOURNAL OF THE ATOMIC ENERGY SOCIETY OF JAPAN, 1978, 20 (10): : 707 - 709
- [16] OPERATING EXPERIENCE OF NUCLEAR POWER PLANT SAFETY SYSTEMS TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1966, 9 (02): : 534 - +
- [17] OPERATING EXPERIENCE AT SHIMANE-NUCLEAR-POWER-PLANT JOURNAL OF THE ATOMIC ENERGY SOCIETY OF JAPAN, 1977, 19 (04): : 233 - 236
- [18] OPERATING EXPERIENCE AT GENKAI NUCLEAR-POWER PLANT JOURNAL OF THE ATOMIC ENERGY SOCIETY OF JAPAN, 1977, 19 (05): : 299 - 302
- [19] Experience of Operation of District Heating Installations at the Beloyarskayh Nuclear Power Plant. Teploenergetika, 1978, (06): : 17 - 20