Iterative local constraint based analysis for solving the resource constrained project scheduling problem

被引:0
|
作者
Ozdamar, Linet [1 ]
Ulusoy, Gunduz [1 ]
机构
[1] Marmara Univ, Istanbul, Turkey
来源
Journal of Operations Management | 1996年 / 14卷 / 03期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:193 / 208
相关论文
共 50 条
  • [1] Hybrid Local Search Methods in Solving Resource Constrained Project Scheduling Problem
    Das, Partha Pratim
    Acharyya, Sriyankar
    JOURNAL OF COMPUTERS, 2013, 8 (05) : 1157 - 1166
  • [2] Solving Resource-Constrained Project Scheduling Problem by A Genetic Local Search Approach
    Dridi, Olfa
    Krichen, Saoussen
    Guitouni, Adel
    2013 5TH INTERNATIONAL CONFERENCE ON MODELING, SIMULATION AND APPLIED OPTIMIZATION (ICMSAO), 2013,
  • [3] Agent-based approach to solving the resource constrained project scheduling problem
    Jedrzejowicz, Piotr
    Ratajczak-Ropel, Ewa
    ADAPTIVE AND NATURAL COMPUTING ALGORITHMS, PT 1, 2007, 4431 : 480 - +
  • [4] Solving the resource constrained project scheduling problem with quantum annealing
    Armas, Luis Fernando Perez
    Creemers, Stefan
    Deleplanque, Samuel
    SCIENTIFIC REPORTS, 2024, 14 (01):
  • [5] Genetic Algorithm for Solving the Resource Constrained Project Scheduling Problem
    Alaa, Touihri
    Saoussen, Krichen
    Adel, Guitouni
    INTERNATIONAL JOURNAL OF APPLIED METAHEURISTIC COMPUTING, 2015, 6 (02) : 45 - 60
  • [6] Branch and Price with Constraint propagation for Resource Constrained Project Scheduling Problem
    Moukrim, Aziz
    Quilliot, Alain
    Toussaint, Helene
    2014 INTERNATIONAL CONFERENCE ON CONTROL, DECISION AND INFORMATION TECHNOLOGIES (CODIT), 2014, : 164 - 169
  • [7] A constraint programming approach for the resource-constrained project scheduling problem
    Liess, Olivier
    Michelon, Philippe
    ANNALS OF OPERATIONS RESEARCH, 2008, 157 (01) : 25 - 36
  • [8] Artificial immune system based approach for solving resource constraint project scheduling problem
    Agarwal, Rina
    Tiwari, M. K.
    Mukherjee, S. K.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2007, 34 (5-6): : 584 - 593
  • [9] A constraint programming approach for the resource-constrained project scheduling problem
    Olivier Liess
    Philippe Michelon
    Annals of Operations Research, 2008, 157 : 25 - 36
  • [10] Artificial immune system based approach for solving resource constraint project scheduling problem
    Agarwal, Rina
    Tiwari, M.K.
    Mukherjee, S.K.
    International Journal of Advanced Manufacturing Technology, 2007, 34 (5-6): : 584 - 593