共 50 条
- [2] IP Start-up Control for 300MW Turbine Unit with Bypass System INTERNATIONAL WORKSHOP ON AUTOMOBILE, POWER AND ENERGY ENGINEERING, 2011, 16
- [3] Electronic expansion valve control during the start-up of refrigeration system Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2002, 36 (02): : 210 - 213
- [4] New start-up curves for a 200 MW steam boiler with natural circulation XI INTERNATIONAL CONFERENCE ON COMPUTATIONAL HEAT, MASS AND MOMENTUM TRANSFER (ICCHMT 2018), 2018, 240
- [6] Distributed control system applied to 200 MW gene rating unit Zhendong Ceshi Yu Zhenduan/Journal of Vibration, Measurement & Diagnosis, 2000, 20 (SUPPL.): : 80 - 84
- [7] 9 steps to start up an electronic control valve panel Water and Wastes Digest, 2015, 55 (03): : 18 - 19
- [8] Research on reducing NOx emissions during start-up period of ultra-supercritical 1000MW unit 2020 6TH INTERNATIONAL CONFERENCE ON ADVANCES IN ENERGY, ENVIRONMENT AND CHEMICAL ENGINEERING, PTS 1-5, 2020, 546
- [9] Research on vibration elimination of a 350 MW heat supply unit during cold start 2020 6TH INTERNATIONAL CONFERENCE ON ENERGY, ENVIRONMENT AND MATERIALS SCIENCE, 2020, 585