共 50 条
- [42] Frequency-constrained unit commitment problem with considering dynamic ramp rate limits in the presence of wind power generation NEURAL COMPUTING & APPLICATIONS, 2019, 31 (09): : 5241 - 5254
- [43] Frequency-constrained unit commitment problem with considering dynamic ramp rate limits in the presence of wind power generation Neural Computing and Applications, 2019, 31 : 5241 - 5254
- [47] Optimal Unit Commitment by Considering High Penetration of Renewable Energy and Ramp Rate of Thermal Units-A case study in Taiwan APPLIED SCIENCES-BASEL, 2019, 9 (03):
- [49] Three-Stage Priority List Unit Commitment for Large-Scale Power Systems Considering Ramp Rate Constraints IEEE Canadian Journal of Electrical and Computer Engineering, 2021, 44 (03): : 329 - 342