This article illustrates the possibilities of industrial process modeling and simulation performed preferably when designing a plant, or during an early stage of operation. Intensive simulations were carried out with the aim of learning about the dynamic performance of the plant in general. Field tests were carried out to demonstate the reliability for the simulation and to establish the improvement to the control system by isolated network operation of the plant.