LABOR QUALITY CONTROL.

被引:0
|
作者
Kessler, Stan
机构
来源
Assembly engineering | 1981年 / 24卷 / 03期
关键词
PERSONNEL - PRODUCTION CONTROL;
D O I
暂无
中图分类号
C93 [管理学]; T [工业技术];
学科分类号
08 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
The article discusses a new system that seeks to raise productivity by matching the company's work force wage/quality level with the price/quality of its product. Control is then placed with the worker where feedback is received and acted upon at the earliest, most effective point while management monitors the system. When properly coupled with specific standards for labor and product quality, labor cost control becomes labor quality control. If properly put into practice, substantial improvement in profits can be obtained without capital equipment expenditures.
引用
收藏
页码:50 / 54
相关论文
共 50 条
  • [1] Quality control.
    Mannessier, L
    Chiaroni, J
    Le Pennec, PY
    TRANSFUSION CLINIQUE ET BIOLOGIQUE, 2001, 8 (06) : 475 - 477
  • [2] Quality Control.
    Andersen, Erling
    Elektronikcentralen (Report) ECR, 1982,
  • [3] PRECOORDINATION OF QUALITY CONTROL.
    Furukawa, Osamu
    Ishizuchi, Hideya
    International Journal of General Systems, 1983, 9 (04) : 183 - 195
  • [4] SWNT quality control.
    Roth, S
    Cech, J
    Hornbostel, BB
    Palmer, E
    Liang, JD
    Wang, JL
    ABSTRACTS OF PAPERS OF THE AMERICAN CHEMICAL SOCIETY, 2004, 227 : U1251 - U1251
  • [5] INSTRUMENTATION FOR QUALITY CONTROL.
    Mohan, V.S.
    QR Journal (Indian Association for Quality & Reliability), 1977, 4 (02): : 139 - 141
  • [6] STANDARDIZATION AND QUALITY CONTROL.
    Singh, B.N.
    1600, (04):
  • [7] Manufacturing Quality Control.
    Colot, Yves
    Donati, Jean-Roger
    Epure, 1987, (16): : 15 - 23
  • [8] STATISTICAL QUALITY CONTROL.
    Anon
    American machinist, 1984, 128 (01): : 97 - 108
  • [9] WATER QUALITY EVALUATION AND CONTROL.
    Evangelou, V.P.
    Sobek, Andrew A.
    1988, : 17 - 47
  • [10] SETTING THE STAGE FOR QUALITY CONTROL.
    McElrath, Gayle W.
    1600, (02):