共 50 条
[41]
COMPUTER-ASSISTED DESIGN CUTS COSTS FOR PIPELINE PROJECT.
[J].
Oil and Gas Journal,
1984, 82 (26)
:84-86
[43]
Computerization cuts 700-mile pipeline CP operating costs
[J].
Gas Industries (Park Ridge, Illinois),
1992, 36 (11)
[47]
QUICK-CONNECT PIPE CUTS INSTALLATION COSTS AT BARNES & TUCKER MINES.
[J].
Coal Age,
1975, 80 (07)
:102-104