Pipeline tow cuts installation costs offshore Tunisia

被引:0
作者
Hagood, Scott [1 ]
Hajji, Tahar [1 ]
Perera, Ed [1 ]
机构
[1] Anadarko Algeria Corp, Houston, United States
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:45 / 49
相关论文
共 50 条
[41]   COMPUTER-ASSISTED DESIGN CUTS COSTS FOR PIPELINE PROJECT. [J].
Stiles, Richard J. ;
Briggs, Larry L. .
Oil and Gas Journal, 1984, 82 (26) :84-86
[42]   MECHANICAL DRY SEAL CUTS PIPELINE COMPRESSOR MAINTENANCE COSTS, DOWNTIME [J].
HESJE, RC ;
PETERSON, RA .
OIL & GAS JOURNAL, 1985, 83 (11) :150-&
[43]   Computerization cuts 700-mile pipeline CP operating costs [J].
Gas Industries (Park Ridge, Illinois), 1992, 36 (11)
[44]   Modeling offshore wind installation costs on the US Outer Continental Shelf [J].
Kaiser, Mark J. ;
Snyder, Brian F. .
RENEWABLE ENERGY, 2013, 50 :676-691
[45]   Pipeline installation [J].
Orelyana, I .
NEFTYANOE KHOZYAISTVO, 2004, (10) :124-126
[47]   QUICK-CONNECT PIPE CUTS INSTALLATION COSTS AT BARNES & TUCKER MINES. [J].
Anon .
Coal Age, 1975, 80 (07) :102-104
[48]   Methodology to calculate the installation costs of offshore wind farms located in deep waters [J].
Castro-Santos, Laura ;
Filgueira-Vizoso, Almudena ;
Lamas-Galdo, Isabel ;
Carral-Couce, Luis .
JOURNAL OF CLEANER PRODUCTION, 2018, 170 :1124-1135
[49]   Development and sea trial of real-time offshore pipeline installation monitoring system [J].
Wang, Facheng ;
Chen, Juan ;
Gao, Shuang ;
Tang, Ke ;
Meng, Xiangwei .
OCEAN ENGINEERING, 2017, 146 :468-476
[50]   IT CUTS COSTS [J].
不详 .
FOOD ENGINEERING, 1984, 56 (07) :57-57