Construction technology for high voltage cable of Jiangya Project

被引:0
|
作者
Li, Jian-zhong
机构
来源
Renmin Changjiang/Yangtze River | 2000年 / 31卷 / 04期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [1] Construction technology of high voltage cable of Jiangya Project
    Yu, Wei-guang
    Zhang, Sheng-ping
    Renmin Changjiang/Yangtze River, 2000, 31 (04):
  • [2] Management of high voltage cable laying for Jiangya Power Station
    Pan, Xi-rong
    Ou Yang, Xue-feng
    Renmin Changjiang/Yangtze River, 2000, 31 (02):
  • [3] On construction archives management of Jiangya project
    2000, Renmin Changjiang, Wuhan, China (31):
  • [4] Supervision and quality evaluation on Jiangya Project construction
    Yu, Ji-xian
    Hong, Yi-xue
    Zen, Long-xiang
    2000, Renmin Changjiang, Wuhan, China (31):
  • [5] High-voltage cable technology
    Dellby, Björn
    Bergman, Gösta
    Karlstrand, Johan
    Kaumanns, Johannes
    ABB Review, 2000, (04): : 35 - 44
  • [6] Price difference settlement for construction items of Jiangya project
    Xu, Zhi-hong
    Guo, Xing-ru
    Renmin Changjiang/Yangtze River, 2000, 31 (02): : 12 - 14
  • [7] Introduction and utilization of foreign funds for the construction of Jiangya project
    Zhou, Jian-guo
    Yao, Jian-jun
    Ling, Yu-biao
    Renmin Changjiang/Yangtze River, 2000, 31 (02):
  • [8] Installation quality control for 220 kV and 110 kV electric cable of Jiangya Project
    Chen, Chang-bin
    Hu, Yi-peng
    Renmin Changjiang/Yangtze River, 2000, 31 (04):
  • [9] Supervision practice of Jiangya project
    Ren Min Chang Jiang, 6 (6-9):
  • [10] Advanced technology for high and extra high voltage XLPE cable insulation
    Huotari, Pekka
    Wire Industry, 2002, 69 (824): : 499 - 502