Maximize the accuracy of cost estimates

被引:0
|
作者
Enyedy, Gustav [1 ,2 ]
机构
[1] PDQ Inc., United States
[2] PDQ, 7830 Sugarbush Lane, Gates Mills, OH 44040-9317, United States
来源
Chemical Engineering | 1997年 / 104卷 / 07期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:106 / 111
相关论文
共 50 条
  • [1] On the accuracy of regulatory cost estimates
    Harrington, W
    Morgenstern, RD
    Nelson, P
    JOURNAL OF POLICY ANALYSIS AND MANAGEMENT, 2000, 19 (02) : 297 - 322
  • [2] SYSTEM FOR IMPROVING THE ACCURACY OF COST ESTIMATES.
    Lau, Amy Hing-Ling
    Lau, Hon-Shiang
    Production and inventory management Washington, D.C., 1986, 27 (04): : 89 - 101
  • [3] Assessment of alternative genotyping strategies to maximize imputation accuracy at minimal cost
    Huang, Yijian
    Hickey, John M.
    Cleveland, Matthew A.
    Maltecca, Christian
    GENETICS SELECTION EVOLUTION, 2012, 44
  • [4] Assessment of alternative genotyping strategies to maximize imputation accuracy at minimal cost
    Yijian Huang
    John M Hickey
    Matthew A Cleveland
    Christian Maltecca
    Genetics Selection Evolution, 44
  • [5] CHARACTERIZING THE ACCURACY OF DOD OPERATING AND SUPPORT COST ESTIMATES
    Ryan, Erin T.
    Jacques, David R.
    Ritschel, Jonathan D.
    Schubert, Christine M.
    JOURNAL OF PUBLIC PROCUREMENT, 2013, 13 (01) : 103 - 132
  • [6] FACTORS INFLUENCING THE CHOICE OF COST ESTIMATES TYPES AND THE ACCURACY OF ESTIMATES FOR CONSTRUCTION PROJECTS
    Simion-Melinte, Cezar
    PROCEEDINGS OF THE 10TH INTERNATIONAL MANAGEMENT CONFERENCE: CHALLENGES OF MODERN MANAGEMENT (IMC 2016), 2016, : 50 - 56
  • [8] Accuracy of traffic forecasts and cost estimates on large transportation projects
    Skamris, Mette K.
    Flyvbjerg, Bent
    Transportation Research Record, 1996, (1518): : 65 - 69
  • [9] Improving the Accuracy of Early Cost Estimates on Transportation Infrastructure Projects
    Karaca, Ilker
    Gransberg, Douglas D.
    Jeong, H. David
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2020, 36 (05)
  • [10] THE ACCURACY OF TRANSIT SYSTEM RIDERSHIP FORECASTS AND CAPITAL COST ESTIMATES
    Button, Kenneth J.
    Doh, Soogwan
    Hardy, Matthew H.
    Yuan, Junyang
    Zhou, Xin
    INTERNATIONAL JOURNAL OF TRANSPORT ECONOMICS, 2010, 37 (02) : 155 - 168