TECHNOLOGY AIDS DEEP-WELL COMPLETION.

被引:0
|
作者
Bleakley, W.B.
机构
来源
Petroleum Engineer International | 1982年 / 54卷 / 05期
关键词
Compendex;
D O I
暂无
中图分类号
学科分类号
摘要
OIL WELL COMPLETION
引用
收藏
页码:32 / 46
相关论文
共 50 条
  • [21] A reinterpretation or the Stillwater deep-well records
    Stauffer, CR
    Burch, EP
    Schwartz, GM
    JOURNAL OF GEOLOGY, 1935, 43 (06): : 630 - 638
  • [22] DEEP-WELL DEWATERING AT GIBRALTAR MINES
    CARPENTER, TL
    YOUNG, R
    CIM BULLETIN, 1980, 73 (816): : 63 - 68
  • [23] PLANNING. . . TO COMPLETION.
    Braye, Jim
    Process Engineering (London), 1985, 66 (03): : 47 - 48
  • [24] GROUNDWATER POLLUTION BY DEEP-WELL INJECTION
    HADJITHE.C
    TRANSACTIONS-AMERICAN GEOPHYSICAL UNION, 1970, 51 (11): : 755 - &
  • [25] TRIGGERED EARTHQUAKES AND DEEP-WELL ACTIVITIES
    NICHOLSON, C
    WESSON, RL
    PURE AND APPLIED GEOPHYSICS, 1992, 139 (3-4) : 561 - 578
  • [26] NEW TECHNIQUES IMPROVE DEEP-WELL STIMULATION
    ERNST, EA
    WORLD OIL, 1971, 172 (04) : 52 - &
  • [27] SHOULD WE CONTINUE DEEP-WELL DISPOSAL
    MANKIN, C
    MOFFETT, T
    GEOTIMES, 1987, 32 (09): : 13 - 15
  • [28] Development and test of a plastic deep-well pump
    Zhang, Q. H.
    Gao, X. F.
    Xu, Y.
    Shi, W. D.
    Lu, W. G.
    Liu, W.
    6TH INTERNATIONAL CONFERENCE ON PUMPS AND FANS WITH COMPRESSORS AND WIND TURBINES (ICPF2013), 2013, 52
  • [29] DEEP-WELL DISPOSAL - ARE SAFEGUARDS BEING IGNORED
    SHELDRICK, MG
    CURRENT MUNICIPAL PROBLEMS, 1970, 12 (01): : 16 - 24
  • [30] FIFE ETHYLENE: COUNTDOWN TO COMPLETION.
    Tayler, Clive
    Process Engineering (London), 1984, 65 (07):