Quantitative evaluation of product disassembly for recycling

被引:0
|
作者
Univ of Missouri-Columbia/Kansas, City, Kansas City, United States [1 ]
机构
来源
Res Eng Des | / 1卷 / 1-14期
关键词
Support for this work was provided by the Office of the Vice President for Research and Associate Provost for Graduate Studies; through the Center lbr Energy and Mineral Resources; Texas A&M University; and the American Plastics Council; Washington; DC;
D O I
暂无
中图分类号
学科分类号
摘要
18
引用
收藏
相关论文
共 50 条
  • [31] PRODUCT DESIGN FOR DISASSEMBLY
    Pekarcikova, Miriam
    DREWNO-WOOD, 2009, 52 (182): : 149 - 152
  • [32] Design for disassembly and recycling software development
    Fu, Hao
    Cai, Jianguo
    Zhongguo Jixie Gongcheng/China Mechanical Engineering, 2000, 11 (09): : 983 - 987
  • [33] Disassembly Layout in WEEE Recycling Process
    Opalic, Milan
    Kljajin, Milan
    Vuckovic, Kresimir
    STROJARSTVO, 2010, 52 (01): : 51 - 58
  • [34] Disassembly for recycling of office electronic equipment
    De Fazio, T.L.
    Delchambre, A.
    De Lit, P.
    European Journal of Mechanical and Environmental Engineering, 1997, 42 (01): : 25 - 31
  • [35] Recycling of electrical motors by automatic disassembly
    Karlsson, B
    Järrhed, JO
    MEASUREMENT SCIENCE AND TECHNOLOGY, 2000, 11 (04) : 350 - 357
  • [36] Construction and energy evaluation method for hybrid graph model of product disassembly
    Tian, Guang-Dong
    Chu, Jiang-Wei
    Liu, Yu-Mei
    Li, Zhong-Kai
    Jin, Xiao-Hong
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2012, 18 (12): : 2613 - 2618
  • [37] Evaluation of the quality of postconsumer plastics obtained from disassembly-based recycling strategies
    Wagner, F.
    Peeters, J.
    De Keyzer, J.
    Duflou, J.
    Dewulf, W.
    POLYMER ENGINEERING AND SCIENCE, 2018, 58 (04): : 485 - 492
  • [38] Disassembly line in product recovery
    Güngör, A
    Gupta, SM
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2002, 40 (11) : 2569 - 2589
  • [39] An ontology approach to product disassembly
    Borst, P
    Akkermans, H
    KNOWLEDGE ACQUISITION, MODELING AND MANAGEMENT, 1997, 1319 : 33 - 48
  • [40] Disassembly of multiple product structures
    Taleb, KN
    Gupta, SM
    COMPUTERS & INDUSTRIAL ENGINEERING, 1997, 32 (04) : 949 - 961