Quick response manufacturing shop floor control-an oxymoron? No!

被引:0
|
作者
机构
关键词
D O I
暂无
中图分类号
学科分类号
摘要
Manufacturing data processing
引用
收藏
相关论文
共 50 条
  • [31] Quick response procurement cost control strategy for fabric manufacturing
    Yan, H.
    Tang, S. -L.
    Yen, G.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (17) : 4769 - 4784
  • [32] The integration of quality control and shop floor control
    Arentsen, AL
    Tiemersma, JJ
    Kals, HJJ
    INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 1996, 9 (02) : 113 - 130
  • [33] Model reducing method for rescheduling manufacturing shop floor
    Thomas, A
    PROCEEDINGS OF THE 35TH SOUTHEASTERN SYMPOSIUM ON SYSTEM THEORY, 2003, : 186 - 190
  • [34] Development of a lean manufacturing system for shop floor productions
    Wang, Z. Y.
    Venkat, P.
    Xie, Qing Sheng
    Proceedings of e-ENGDET2006, 2006, : 167 - 172
  • [35] Research on agile manufacturing execution system in shop floor
    Rao, Yunqing
    Liu, Shiping
    Li, Shuxia
    Li, Peigen
    Zhongguo Jixie Gongcheng/China Mechanical Engineering, 2002, 13 (08):
  • [36] Preparing undergraduates for project management on the manufacturing shop floor
    1600, National Association of Industrial Technology (32):
  • [37] PRODUCTIVITY THROUGH SHOP FLOOR CONTROL
    ALBERT, M
    MODERN MACHINE SHOP, 1983, 56 (07) : 58 - 67
  • [38] WINNING THE SHOP FLOOR CONTROL BATTLE
    GETTELMAN, K
    MODERN MACHINE SHOP, 1984, 56 (12) : 82 - 87
  • [39] Evolutionary development in shop floor control
    Bongaerts, L
    Jordan, P
    Timmermans, P
    Valckenaers, P
    Wyns, J
    COMPUTERS IN INDUSTRY, 1997, 33 (2-3) : 295 - 304
  • [40] VSFC - Virtual Shop Floor Control
    de Benito Martin, Juan Jose
    Sanz Angulo, Pedro
    SISTEMAS Y TECNOLOGIAS DE INFORMACION, 2010, : 133 - +