Earned value project management

被引:0
|
作者
Fleming, Quentin W. [1 ]
Koppelman, Joel M. [1 ]
机构
[1] Primavera Systems Inc
来源
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:13 / 15
相关论文
共 50 条
  • [41] Project control based on a mutual application of pert and earned value management methods
    Mishakova, Anastasiia
    Vakhrushkina, Anna
    Murgul, Vera
    Sazonova, Tatiana
    15TH INTERNATIONAL SCIENTIFIC CONFERENCE UNDERGROUND URBANISATION AS A PREREQUISITE FOR SUSTAINABLE DEVELOPMENT, 2016, 165 : 1812 - 1817
  • [42] A game-based learning method to teach project management - the case of the earned value management
    Jaaska, Elina
    Kujala, Jaakko
    Aaltonen, Kirsi
    COGENT EDUCATION, 2023, 10 (02):
  • [43] An alternative to earned value reporting on project performance
    Carmichael, David G.
    Balatbat, Maria C. A.
    PROCEEDINGS OF CRIOCM 2007 INTERNATIONAL RESEARCH SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1 AND 2, 2007, : 602 - 617
  • [44] Using Earned Value Management and Schedule Risk Analysis with resource constraints for project control
    Song, Jie
    Martens, Annelies
    Vanhoucke, Mario
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 297 (02) : 451 - 466
  • [45] A multivariate approach for top-down project control using earned value management
    Colin, Jeroen
    Martens, Annelies
    Vanhoucke, Mario
    Wauters, Mathieu
    DECISION SUPPORT SYSTEMS, 2015, 79 : 65 - 76
  • [46] A comparison of the performance of various project control methods using earned value management systems
    Colin, Jeroen
    Vanhoucke, Mario
    EXPERT SYSTEMS WITH APPLICATIONS, 2015, 42 (06) : 3159 - 3175
  • [47] Application of Earned Value Management to Compute the Project Performance Using Analytical Network Process
    Ramani, Sujatha Evangelin
    Sruthi, N.
    JORDAN JOURNAL OF CIVIL ENGINEERING, 2016, 10 (02) : 254 - 265
  • [48] The Application of Earned Value Management in Small and Medium-Sized Hydropower Stations Project
    Zhang Jing-yang
    Wang Song-jiang
    ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4, 2013, 357-360 : 2371 - 2378
  • [49] Limit State Earned Value Analysis Impact on Network Security Project Management Decisions
    Staley, Michael
    2016 IEEE INTERNATIONAL CARNAHAN CONFERENCE ON SECURITY TECHNOLOGY (ICCST), 2016, : 100 - 106
  • [50] Comparison of the Stability and Accuracy of Deterministic Project Cost Prediction Methods in Earned Value Management
    Barrientos-Orellana, Alexis
    Ballesteros-Perez, Pablo
    Mora-Melia, Daniel
    Cerezo-Narvaez, Alberto
    Gutierrez-Bahamondes, Jimmy H.
    BUILDINGS, 2023, 13 (05)