共 50 条
- [43] Two-agent-based single-machine scheduling with switchover time to minimize total weighted completion time and makespan objectives [J]. Annals of Operations Research, 2018, 269 : 623 - 640
- [46] Single-Machine Scheduling to Minimize Total Completion Time and Tardiness with Two Competing Agents [J]. SCIENTIFIC WORLD JOURNAL, 2014,
- [49] On-line scheduling of a single machine to minimize total weighted completion time [J]. PROCEEDINGS OF THE THIRTEENTH ANNUAL ACM-SIAM SYMPOSIUM ON DISCRETE ALGORITHMS, 2002, : 548 - 557