Design of the forth replacement crossing, Scotland, UK

被引:0
|
作者
Arup, London, United Kingdom [1 ]
不详 [2 ]
机构
来源
Large Structures Infrastructures Environ. Constrained Urban. Areas | / 202-203期
关键词
Compendex;
D O I
暂无
中图分类号
学科分类号
摘要
Cable stayed bridges
引用
收藏
相关论文
共 5 条
  • [1] CROSSING THE FORTH
    Carter, Matt
    Ceng, P. E.
    Hornby, Richard
    Hussain, Naeem
    Murray, Iain
    CIVIL ENGINEERING, 2019, 89 (01): : 44 - +
  • [2] EARTHQUAKE RISK AND DESIGN GROUND MOTIONS IN THE UK OFFSHORE AREA
    DOWRICK, DJ
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 2-RESEARCH AND THEORY, 1981, 71 (JUN): : 305 - 321
  • [3] Study on the design of similar model test of box tunnel crossing ground fissure with 30°
    School of Civil Eng., Chang'an Univ., Xi'an 710061, China
    不详
    Sichuan Daxue Xuebao (Gongcheng Kexue Ban), 1600, 2 (69-74): : 69 - 74
  • [4] DEVELOPMENT OF A SHOCK ABSORBING BIOMEDICAL ELASTOMER FOR A NEW TOTAL ELBOW REPLACEMENT DESIGN
    WONG, EW
    WHITE, RC
    BIOMATERIALS MEDICAL DEVICES AND ARTIFICIAL ORGANS, 1979, 7 (02): : 283 - 290
  • [5] Study on Mix Proportion Design Procedure for Super-high Cementitious RCC with Stone Powder Replacement
    Aosaka, Yushi
    Tsutsui, Shoji
    Miki, Tomohiro
    JOURNAL OF ADVANCED CONCRETE TECHNOLOGY, 2023, 21 (03) : 123 - 135