Numerical simulation and optimization of the construction process of large-span diversion tunnel

被引:0
|
作者
机构
[1] [1,Zhu, Dapeng
[2] Tian, Li
[3] Yang, Jian
[4] Huang, Lu
来源
Zhu, D. (zdpcug@126.com) | 2013年 / E-Journal of Geotechnical Engineering, 214B Engineering South, Stillwater, OK 74078, United States卷 / 18 N期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [41] Study on Construction of Long Span and Soft Rock Tunnel with Numerical Simulation
    Zhu, Bin
    Shi, Xiaojing
    CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE II, PTS 1 AND 2, 2013, 438-439 : 964 - +
  • [42] CONSTRUCTION SIMULATION FOR LARGE-SPAN CONTINUOUS STEEL-CONCRETE COMPOSITE BEAM BRIDGE
    Jia, Zi-Wen
    Chen, Ai-Guo
    ISISS '2009: INNOVATION & SUSTAINABILITY OF STRUCTURES, VOLS 1 AND 2, 2009, : 1296 - 1301
  • [43] Mechanical behaviour of a large-span double-arch tunnel
    Shuchen Li
    Chao Yuan
    Xianda Feng
    Shucai Li
    KSCE Journal of Civil Engineering, 2016, 20 : 2737 - 2745
  • [44] Study of deformation controlling measures for large-span shallow tunnel
    Wei Long-hai
    Wang Ming-nian
    Zhao Dong-ping
    Ji Yan-lei
    ROCK AND SOIL MECHANICS, 2010, 31 (02) : 577 - +
  • [45] Supporting technology for shallow large-span neighborhood loess tunnel
    He Li-chao
    Wang Meng-shu
    Li Yu-jie
    ROCK AND SOIL MECHANICS, 2013, 34 : 306 - 310
  • [46] Mechanical behaviour of a large-span double-arch tunnel
    Li, Shuchen
    Yuan, Chao
    Feng, Xianda
    Li, Shucai
    KSCE JOURNAL OF CIVIL ENGINEERING, 2016, 20 (07) : 2737 - 2745
  • [47] Study of deformation controlling measures for large-span shallow tunnel
    Wei, Long-Hai
    Wang, Ming-Nian
    Zhao, Dong-Ping
    Ji, Yan-Lei
    Yantu Lixue/Rock and Soil Mechanics, 2010, 31 (02): : 576 - 581
  • [48] Safety risk analysis and assessment of complex buildings in shallow-buried large-span tunnel construction
    Hou, Yanjuan
    Zhang, Dingli
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2007, 26 (SUPPL. 2): : 3718 - 3726
  • [49] Simulation and optimization of whole TBM tunnel construction process
    College of Water and Electrics, Xi'an University of Technology, Xi'an 710048, China
    不详
    Liaoning Gongcheng Jishu Daxue Xuebao (Ziran Kexue Ban), 2007, 6 (868-870):
  • [50] Mechanism and control method of large deformation for large-span chlorite schist tunnel
    Chen J.-X.
    Chen L.-J.
    Luo Y.-B.
    Wang C.-W.
    Liu W.-W.
    Jiaotong Yunshu Gongcheng Xuebao/Journal of Traffic and Transportation Engineering, 2021, 21 (02): : 93 - 106