共 50 条
- [1] Analysis of flow pattern in outlet conduit of pumping station 2000, Water Resources & Electric Power Press, China
- [2] Optimal operation scheduling of a pumping station in east route of South-to-North water diversion project 8TH INTERNATIONAL CONFERENCE ON APPLIED ENERGY (ICAE2016), 2017, 105 : 3031 - 3037
- [4] Analysis of crack initiation and Treatment in the South-to-north water diversion Suining two station project FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING III, PTS 1-3, 2013, 368-370 : 1123 - +
- [5] Optimal operation scheduling of an adjustable-blade pumping station in the East Route of South-to-North Water Diversion Project Shuili Xuebao/Journal of Hydraulic Engineering, 2016, 47 (10): : 1332 - 1338
- [6] Study on the Program Breakdown Structure System of the South-to-North Water Diversion Project CRIOCM2009: INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1-6, 2009, : 2542 - 2546
- [7] Study on source pump station optimal operation of first-stage Eastern Route of South-to-North Water Diversion Project Shuili Fadian Xuebao/Journal of Hydroelectric Engineering, 2008, 27 (04): : 48 - 53