Drilling for coalbed methane in the San Juan Basin with coiled tubing

被引:0
作者
Bybee, Karen
机构
来源
JPT, Journal of Petroleum Technology | 2007年 / 59卷 / 06期
关键词
In; 2006; a coiled-tubing-drilling (CTD) pilot program was initiated in the San Juan basin consisting of seven wells; drilled in order of increasing complexity. The intention was to evaluate the capabilities of CTD and its potential for use in the San Juan basin. The rig used was a new; custom-built; coiled-tubing (CT)/rotary hybrid rig with a single-sized derrick; rotary table; and topdrive. This allowed the rig to drill with jointed pipe; handle and make up bottomhole assemblies (BHAs); and run liners and casing;
D O I
暂无
中图分类号
学科分类号
摘要
Journal article (JA)
引用
收藏
页码:73 / 74
相关论文
empty
未找到相关数据