共 35 条
Experimental study on the performance of shield tunnel tail grout in ground
被引:10
作者:
Liang, Jiaxin
[1
]
Liu, Wei
[2
,3
,6
]
Yin, Xinsheng
[3
,4
]
Li, Wentao
[2
]
Yang, Zhe
[5
]
Yang, Jichen
[2
]
机构:
[1] Taiyuan Univ Technol, Coll Civil Engn, Taiyuan 030024, Peoples R China
[2] Soochow Univ, Sch Rail Transportat, Suzhou 215131, Peoples R China
[3] Key Lab Safe Construct & Intelligent Maintenance U, Hangzhou 310015, Peoples R China
[4] Hangzhou City Univ, Dept Civil & Environm Engn, Hangzhou 310015, Peoples R China
[5] Zhejiang Univ Technol, Sch Comp Sci & Technol, Hangzhou 310023, Peoples R China
[6] Intelligent Urban Rail Engn Res Ctr Jiangsu Prov, Suzhou 215131, Peoples R China
来源:
基金:
中国国家自然科学基金;
关键词:
Shield tunnel;
Lab test;
Tail grout behavior;
Deformation;
Working performance;
BEHAVIOR;
BACKFILL;
D O I:
10.1016/j.undsp.2024.07.001
中图分类号:
TU [建筑科学];
学科分类号:
0813 ;
摘要:
Shield tail grouting is an important measure to control tunnelling-induced ground deformation by injecting prepared grouting materials to fill the tail gap. The working performance of grout is usually invisible and hard to obtain in construction. This paper carries out an experimental study to investigate the tail grout behavior in ground. In the current research, a testing device is developed to explore the grout behavior in varying soils. The grout working performance is evaluated not only by the liquid grout properties such as fluidity, consistency, bleeding rate, stone rate and compressed deformation but also solid grout properties such as unconfined compressive strength and permeability. Three typical grouts are chosen and their behaviors in the various soils are observed. To take an insight on the behaviors, scanning electron microscopy and mercury intrusion porosimetry analysis are employed. The microstructure of solid grout is a sign of its working performance. The observation shows that the solid grout micro-structure is influenced by grout proportions, pressure, and ground permeabilities. The experimental results are applied in the case of Beijing Metro Line 12 for validation and as a result, the ground movement is inhibited due to high performance of tail grout.
引用
收藏
页码:277 / 292
页数:16
相关论文