Fast method for heuristics in large-scale flow shop scheduling

被引:0
|
作者
Department of Automation, Tsinghua University, Beijing 100084, China [1 ]
不详 [2 ]
机构
[1] Department of Automation, Tsinghua University
[2] Department of Computer Science and Technology, Harbin University of Science and Technology
来源
Tsinghua Sci. Tech. | 2006年 / 1卷 / 12-18期
基金
中国博士后科学基金;
关键词
Flow shop; Heuristics; Scheduling; Total completion-time;
D O I
10.1016/S1007-0214(06)70148-1
中图分类号
学科分类号
摘要
Fast computation methods are needed for the heuristics of flow shop scheduling problems in practical manufacturing environments. This paper describes a generalized flow shop model, which is an extension of the classical model, in which not all machines are available at time zero. The general completion-time computing method is used to compute completion time of generalized flow shops. The transform classical flow shop to generalized shop (TCG) method is used to transform classical schedules into generalized schedules with less jobs. INSERT and SWAP, extended from job-insertion and pair-wise exchange which are fundamental procedures used in most heuristics for classical flow shops, reduce the CPU time by 1/2 and 1/3 respectively. The CPU time of 14 job-insertion and pair-wise exchange based heuristics are analyzed with and without the TCG method. The results show that TCG method considerably reduces the CPU time.
引用
收藏
页码:12 / 18
页数:6
相关论文
共 50 条
  • [41] Routing open shop and flow shop scheduling problems
    Yu, Wei
    Liu, Zhaohui
    Wang, Leiyang
    Fan, Tijun
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 213 (01) : 24 - 36
  • [42] Heuristics for flow shop rescheduling with mixed blocking constraints
    Tighazoui, Ayoub
    Sauvey, Christophe
    Sauer, Nathalie
    TOP, 2023, 32 (2) : 169 - 201
  • [43] A Comparison of Constructive Heuristics with the Objective of Minimizing Makespan in the Flow-Shop Scheduling Problem
    Semanco, Pavol
    Modrak, Vladimir
    ACTA POLYTECHNICA HUNGARICA, 2012, 9 (05) : 177 - 190
  • [44] Flow Shop Scheduling with Shortening Jobs for Makespan Minimization
    Sun, Zheng-Wei
    Lv, Dan-Yang
    Wei, Cai-Min
    Wang, Ji-Bo
    MATHEMATICS, 2025, 13 (03)
  • [45] Heuristics for the Hybrid Flow Shop Scheduling Problem with Sequence-Dependent Setup times
    Yong, Liao
    Zhantao, Li
    Xiang, Li
    Chenfeng, Peng
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2022, 2022
  • [46] Improvement Tools for NEH Based Heuristics on Permutation and Blocking Flow Shop Scheduling Problems
    Companys, Ramon
    Ribas, Imma
    Mateo, Mane
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: NEW CHALLENGES, NEW APPROACHES, 2010, 338 : 33 - 40
  • [47] A heuristic approach for large scale job shop scheduling problems
    Department of Industrial Engineering, Amirkabir University of Technology, P.O. Box 15875-4413, Tehran, Iran
    J. Appl. Sci., 2008, 6 (992-999): : 992 - 999
  • [48] Improvement of constructive heuristics using variable neighbourhood descent for scheduling a flow shop with sequence dependent setup time
    Vanchipura, Rajesh
    Sridharan, R.
    Babu, A. Subash
    JOURNAL OF MANUFACTURING SYSTEMS, 2014, 33 (01) : 65 - 75
  • [49] Heuristics for scheduling in a no-wait open shop with movable dedicated machines
    Lin, Hung-Tso
    Lee, Hong-Tau
    Pan, Wen-Jung
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 111 (02) : 368 - 377
  • [50] Fast heuristics for large scale covering-location problems
    Brotcorne, L
    Laporte, G
    Semet, F
    COMPUTERS & OPERATIONS RESEARCH, 2002, 29 (06) : 651 - 665