Fast method for heuristics in large-scale flow shop scheduling

被引:0
|
作者
Department of Automation, Tsinghua University, Beijing 100084, China [1 ]
不详 [2 ]
机构
[1] Department of Automation, Tsinghua University
[2] Department of Computer Science and Technology, Harbin University of Science and Technology
来源
Tsinghua Sci. Tech. | 2006年 / 1卷 / 12-18期
基金
中国博士后科学基金;
关键词
Flow shop; Heuristics; Scheduling; Total completion-time;
D O I
10.1016/S1007-0214(06)70148-1
中图分类号
学科分类号
摘要
Fast computation methods are needed for the heuristics of flow shop scheduling problems in practical manufacturing environments. This paper describes a generalized flow shop model, which is an extension of the classical model, in which not all machines are available at time zero. The general completion-time computing method is used to compute completion time of generalized flow shops. The transform classical flow shop to generalized shop (TCG) method is used to transform classical schedules into generalized schedules with less jobs. INSERT and SWAP, extended from job-insertion and pair-wise exchange which are fundamental procedures used in most heuristics for classical flow shops, reduce the CPU time by 1/2 and 1/3 respectively. The CPU time of 14 job-insertion and pair-wise exchange based heuristics are analyzed with and without the TCG method. The results show that TCG method considerably reduces the CPU time.
引用
收藏
页码:12 / 18
页数:6
相关论文
共 50 条
  • [31] A Large-Scale Scheduling Method for Multiple Agile Optical Satellites
    Liu, Zheng
    Xiong, Wei
    Xiong, Minghui
    CMES-COMPUTER MODELING IN ENGINEERING & SCIENCES, 2022, 136 (02): : 1143 - 1163
  • [32] Fast Heuristics for Integrated Planning and Scheduling
    Rietz, Juergen
    Alves, Claudio
    de Carvalho, Jose Valerio
    COMPUTATIONAL SCIENCE AND ITS APPLICATIONS - ICCSA 2015, PT II, 2015, 9156 : 413 - 428
  • [33] A composite algorithm for total completion-time minimization in large flow shop scheduling
    Li, Xiao-Ping
    Wang, Qian
    PROCEEDINGS OF 2006 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2006, : 2439 - +
  • [34] Flow shop scheduling problem with conflict graphs
    Nour El Houda Tellache
    Mourad Boudhar
    Annals of Operations Research, 2018, 261 : 339 - 363
  • [35] Flow shop scheduling problem with conflict graphs
    Tellache, Nour El Houda
    Boudhar, Mourad
    ANNALS OF OPERATIONS RESEARCH, 2018, 261 (1-2) : 339 - 363
  • [36] Flow shop scheduling problems with assembly operations: a review and new trends
    Komaki, G. M.
    Sheikh, Shaya
    Malakooti, Behnam
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (10) : 2926 - 2955
  • [37] Effective heuristics for the no-wait flow shop scheduling problem with total flow time minimization
    Gao, Kaizhou
    Pan, Quanke
    Suganthan, P. N.
    Li, Junqing
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 66 (9-12) : 1563 - 1572
  • [38] A contribution and new heuristics for open shop scheduling
    Naderi, B.
    Ghomi, S. M. T. Fatemi
    Aminnayeri, M.
    Zandieh, M.
    COMPUTERS & OPERATIONS RESEARCH, 2010, 37 (01) : 213 - 221
  • [39] Heuristics for large scale labour scheduling problems in retail sector
    Zolfaghari, S.
    El-Bouri, A.
    Namiranian, B.
    Quan, V.
    INFOR, 2007, 45 (03) : 111 - 122
  • [40] AN ASSESSMENT OF HEURISTICS FOR FAST SCHEDULING OF GRID JOBS
    Moeser, Florian
    Suess, Wolfgang
    Jakob, Wilfried
    Quinte, Alexander
    Stucky, Karl-Uwe
    ICSOFT 2010: PROCEEDINGS OF THE FIFTH INTERNATIONAL CONFERENCE ON SOFTWARE AND DATA TECHNOLOGIES, VOL 1, 2010, : 184 - 191