Fast method for heuristics in large-scale flow shop scheduling

被引:0
|
作者
Department of Automation, Tsinghua University, Beijing 100084, China [1 ]
不详 [2 ]
机构
[1] Department of Automation, Tsinghua University
[2] Department of Computer Science and Technology, Harbin University of Science and Technology
来源
Tsinghua Sci. Tech. | 2006年 / 1卷 / 12-18期
基金
中国博士后科学基金;
关键词
Flow shop; Heuristics; Scheduling; Total completion-time;
D O I
10.1016/S1007-0214(06)70148-1
中图分类号
学科分类号
摘要
Fast computation methods are needed for the heuristics of flow shop scheduling problems in practical manufacturing environments. This paper describes a generalized flow shop model, which is an extension of the classical model, in which not all machines are available at time zero. The general completion-time computing method is used to compute completion time of generalized flow shops. The transform classical flow shop to generalized shop (TCG) method is used to transform classical schedules into generalized schedules with less jobs. INSERT and SWAP, extended from job-insertion and pair-wise exchange which are fundamental procedures used in most heuristics for classical flow shops, reduce the CPU time by 1/2 and 1/3 respectively. The CPU time of 14 job-insertion and pair-wise exchange based heuristics are analyzed with and without the TCG method. The results show that TCG method considerably reduces the CPU time.
引用
收藏
页码:12 / 18
页数:6
相关论文
共 50 条
  • [21] Time lag size in multiple operations flow shop scheduling heuristics
    Riezebos, J
    Gaalman, GJC
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 105 (01) : 72 - 90
  • [22] Comparison of Initial Solutions of Heuristics for No-wait Flow Shop Scheduling
    Sapkal, Sagar
    Laha, Dipak
    COMPUTATIONAL INTELLIGENCE AND INFORMATION TECHNOLOGY, 2011, 250 : 294 - 298
  • [23] Fast and Accurate Risk Evaluation for Scheduling Large-Scale Construction Projects
    Jun, Dho Heon
    El-Rayes, Khaled
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2011, 25 (05) : 407 - 417
  • [24] Heuristics for dimensioning large-scale MPLS networks
    Borges, C
    de Sousa, A
    Valadas, R
    INTERNET PERFORMANCE AND CONTROL OF NETWORK SYSTEMS II, 2001, 4523 : 27 - 34
  • [25] Genetic Programming With Lexicase Selection for Large-Scale Dynamic Flexible Job Shop Scheduling
    Xu, Meng
    Mei, Yi
    Zhang, Fangfang
    Zhang, Mengjie
    IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2024, 28 (05) : 1235 - 1249
  • [26] An evaluation of heuristics for scheduling a non-delay permutation flow shop with family setups to minimize total earliness and tardiness
    Schaller, J.
    Valente, J. M. S.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2013, 64 (06) : 805 - 816
  • [27] ANALYSIS OF CLASSES OF HEURISTICS FOR SCHEDULING A 2-STAGE FLOW-SHOP WITH PARALLEL MACHINES AT ONE-STAGE
    CHEN, B
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1995, 46 (02) : 234 - 244
  • [28] Near-Optimal Heuristics for Just-In-Time Jobs Maximization in Flow Shop Scheduling
    Fuchigami, Helio Yochihiro
    Sarker, Ruhul
    Rangel, Socorro
    ALGORITHMS, 2018, 11 (04)
  • [29] Flow shop scheduling with blocking using modified harmony search algorithm with neighboring heuristics methods
    Abu Doush, Iyad
    Al-Betar, Mohammed Azmi
    Awadallah, Mohammed A.
    Santos, Eugene
    Hammouri, Abdelaziz, I
    Mafarjeh, Majdi
    AlMeraj, Zainab
    APPLIED SOFT COMPUTING, 2019, 85
  • [30] A Pattern Matching Method for Large-Scale Multipurpose Process Scheduling
    He, Yaohua
    Hui, Chi-Wai
    AICHE JOURNAL, 2011, 57 (03) : 671 - 694