Improved PSO algorithm for multi-objective optimization flexible job shop scheduling problems

被引:0
|
作者
Bai, Junjie [1 ]
Wang, Ningsheng [1 ]
Tang, Dunbing [1 ]
机构
[1] CMS Research Centre, Nanjing University of Aeronautics and Astronautics, Nanjing, 210016, China
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:447 / 453
相关论文
共 50 条
  • [21] An improved multi-objective genetic algorithm for fuzzy flexible job-shop scheduling problem
    Wang, Xiaojuan
    Li, Wenfeng
    Zhang, Ying
    INTERNATIONAL JOURNAL OF COMPUTER APPLICATIONS IN TECHNOLOGY, 2013, 47 (2-3) : 280 - 288
  • [22] An Efficient PSO Algorithm for Finding Pareto-Frontier in Multi-Objective Job Shop Scheduling Problems
    Wisittipanich, Warisa
    Kachitvichyanukul, Voratas
    INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 2013, 12 (02): : 151 - 160
  • [23] An improved particle swarm optimization for multi-objective flexible job-shop scheduling problem
    Jia, Zhaohong
    Chen, Huaping
    Tang, Jun
    PROCEEDINGS OF 2007 IEEE INTERNATIONAL CONFERENCE ON GREY SYSTEMS AND INTELLIGENT SERVICES, VOLS 1 AND 2, 2007, : 1584 - 1589
  • [24] A hybrid discrete firefly algorithm for solving multi-objective flexible job shop scheduling problems
    Karthikeyan, S.
    Asokan, P.
    Nickolas, S.
    Page, Tom
    INTERNATIONAL JOURNAL OF BIO-INSPIRED COMPUTATION, 2015, 7 (06) : 386 - 401
  • [25] An effective hybrid optimization approach for multi-objective flexible job-shop scheduling problems
    Xia, WJ
    Wu, ZM
    COMPUTERS & INDUSTRIAL ENGINEERING, 2005, 48 (02) : 409 - 425
  • [26] A PARTICLE SWARM OPTIMIZATION ALGORITHM FOR THE MULTI-OBJECTIVE FLEXIBLE JOB-SHOP SCHEDULING PROBLEM
    Sun, Ying
    He, Jingbo
    JOURNAL OF NONLINEAR AND CONVEX ANALYSIS, 2024, 25 (03) : 579 - 590
  • [27] Approach for Multi-objective Flexible Job shop scheduling
    Hui, Hongjie
    AUTOMATIC MANUFACTURING SYSTEMS II, PTS 1 AND 2, 2012, 542-543 : 407 - 410
  • [28] Dynamic scheduling on multi-objective flexible Job Shop
    Liu, Ai-Jun
    Yang, Yu
    Xing, Qing-Song
    Lu, Hui
    Zhang, Yu-Dong
    Zhou, Zhen-Yu
    Wu, Guang-Hui
    Zhao, Xiao-Hua
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2011, 17 (12): : 2629 - 2637
  • [29] MULTI OBJECTIVE FLEXIBLE JOB SHOP SCHEDULING PROBLEMS
    Kaya, Serkan
    Figlali, Nilgun
    SIGMA JOURNAL OF ENGINEERING AND NATURAL SCIENCES-SIGMA MUHENDISLIK VE FEN BILIMLERI DERGISI, 2013, 31 (04): : 605 - 623
  • [30] Robust scheduling for multi-objective flexible job-shop problems with flexible workdays
    Zhang, Jiae
    Yang, Jianjun
    Zhou, Yong
    ENGINEERING OPTIMIZATION, 2016, 48 (11) : 1973 - 1989