Wealth-based production planning with uncertain lot sizing

被引:0
|
作者
机构
[1] Wang, X.J.
[2] Choi, S.H.
来源
Wang, X.J. (kxjwang@hku.hk) | 1600年 / International Association of Engineers卷 / 44期
关键词
Production control - Manufacture - Stochastic models - Stochastic systems - Shareholders - Industrial research - Planning;
D O I
暂无
中图分类号
学科分类号
摘要
The lot sizing policy is pivotal to batch manufacturing, especially in uncertain production planning environments. Although progress has been made in this field for some operational local objectives, the optimised results are often rendered unrealistic because few studies have considered the overall business goal and the economic environment where businesses operate. This research aims to examine a stochastic lot sizing production planning optimisation model for make-to-order (MTO) manufacturing with a focus on the overall business goal-the maximisation of shareholder wealth. In addition to the wealth-based optimisation objective, the effect of the economic environment is also incorporated into this model. Numerical experiments validate the significance of considering such economic and financial constraints and objectives, especially for firms with relatively high setup costs or being sensitive to lead times. The proposed production planning model can pretty well assist the management in gaining insight into potential challenges and opportunities pertinent to the shareholder wealth enhancement.
引用
收藏
相关论文
共 50 条
  • [1] Lot sizing production planning model with multiple plants and uncertain information
    Liu, Wei
    PROCEEDINGS OF THE FIFTH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2011, : 214 - 217
  • [2] Stochastic Green Production Planning with Lot Sizing
    Wang, X. J.
    Choi, S. H.
    ENGINEERING LETTERS, 2020, 28 (02) : 343 - 346
  • [3] Remanufacturing lot sizing production planning considering product differentiation in multi-uncertain environment
    Jing, Yi
    Wang, Xu
    Li, Wen-Chuan
    Deng, Lei
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2012, 18 (12): : 2650 - 2658
  • [4] Scenario-based planning for lot-sizing and scheduling with uncertain processing times
    Beraldi, P
    Ghiani, G
    Guerriero, E
    Grieco, A
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2006, 101 (01) : 140 - 149
  • [5] Wealth-Based Penal Disenfranchisement
    Colgan, Beth A.
    VANDERBILT LAW REVIEW, 2019, 72 (01) : 55 - 189
  • [7] LOT-SIZING FOR PRODUCTION PLANNING IN A RECOVERY SYSTEM WITH RETURNS
    Zouadi, Tarik
    Yalaoui, Alice
    Reghioui, Mohamed
    El Kadiri, Kamal Eddin
    RAIRO-OPERATIONS RESEARCH, 2015, 49 (01) : 123 - 142
  • [8] Lot-sizing for production planning in a recovery system with returns
    Zouadi, Tarik
    Yalaoui, Alice
    Reghioui, Mohamed
    Eddin El Kadiri, Kamal
    PROCEEDINGS OF 2013 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IEEE-IESM 2013), 2013, : 402 - 407
  • [9] Fuzzy programming model for lot sizing production planning problem
    Yan, WZ
    Zhao, JH
    Cao, Z
    FUZZY SYSTEMS AND KNOWLEDGE DISCOVERY, PT 1, PROCEEDINGS, 2005, 3613 : 285 - 294
  • [10] Wealth-based trust and the development of collective action
    Jones, EC
    WORLD DEVELOPMENT, 2004, 32 (04) : 691 - 711