Hopfield-based solution for resource-leveling problem

被引:0
|
作者
College of Information Science, South China Agriculture University, Guangzhou 510640, China [1 ]
机构
来源
Xitong Gongcheng Lilum yu Shijian | 2006年 / 3卷 / 83-87期
关键词
6;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [21] A genetic algorithm for the robust resource leveling problem
    Li, Hongbo
    Demeulemeester, Erik
    JOURNAL OF SCHEDULING, 2016, 19 (01) : 43 - 60
  • [22] Accelerated Particle Swarm Optimization to Solve Large-Scale Network Plan Optimization of Resource-Leveling with a Fixed Duration
    Zhang, Houxian
    Yang, Zhaolan
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2018, 2018
  • [23] Genetic algorithm based optimization for resource leveling problem with precedence constrained scheduling
    Selvam, Gopinath
    Tadepalli, T. Ch. Madhavi
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (04) : 659 - 668
  • [24] Flexible resource-constrained resource leveling project scheduling problem
    Yu, Xiao-Guang
    Zhan, De-Chen
    Nie, Lan-Shun
    Chu, Dian-Hui
    Xu, Xiao-Fei
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2010, 16 (09): : 1967 - 1976
  • [25] DYNAMIC SYSTEM IDENTIFICATION USING HIGH-ORDER HOPFIELD-BASED NEURAL NETWORK (HOHNN)
    Wang, Chi-Hsu
    Hung, Kun-Neng
    ASIAN JOURNAL OF CONTROL, 2012, 14 (06) : 1553 - 1566
  • [26] Indirect Adaptive Control Using Hopfield-Based Dynamic Neural Network for SISO Nonlinear Systems
    Chen, Ping-Cheng
    Wang, Chi-Hsu
    Lee, Tsu-Tian
    ENGINEERING APPLICATIONS OF NEURAL NETWORKS, PROCEEDINGS, 2009, 43 : 336 - +
  • [27] Improved particle swarm optimization for resource leveling problem
    Qi, Jian-Xun
    Wang, Qiang
    Guo, Xin-Zhi
    PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2007, : 896 - 901
  • [28] Heuristic algorithm for resource leveling problem in emergency scheduling
    Liang, Yan
    Jin, Ye
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2009, 15 (06): : 1165 - 1171
  • [29] Genetic algorithm for resource leveling problem in project scheduling
    Liu, S.X.
    Wang, M.G.
    2001, Systems Engineering Society of China (21):
  • [30] GA applied in project resource allocation and leveling scheduling problem
    Luo, SP
    Tang, XZ
    Lin, LF
    Progress in Intelligence Computation & Applications, 2005, : 703 - 708