The Caribbean sea of a foundation pit engineering implementation and analysis of pumping test

被引:0
作者
Zhou, Xiaosong [1 ]
Zhang, Jianshan [1 ]
Yang, Xiaopeng [1 ]
Liu, Zhenghong [1 ]
机构
[1] China JIKAN Research Institute Of Engineering Investigations And Design, Co. Ltd, Xian,710043, China
来源
Shuili Xuebao/Journal of Hydraulic Engineering | 2015年 / 46卷
关键词
Pumps - Water management;
D O I
暂无
中图分类号
学科分类号
摘要
In this paper the steady pumping test, unsteady pumping test and interfering-wells pumping test have been implemented in order to provide the comprehensive permeability coefficient, influence radius and so on for designing foundation pit support and precipitation support in this Thermal power plant construction project that locates in the Caribbean 350 meters away from the coastline. The recommendation formula of Specification of Pumping Test in Borehole for Hydropower and Water Conservancy Engineering has been referenced to determine the related parameters. The modified investigation results which use to guide foundation pit support and dewatering design, has been verified in the subsequent implementation process of support and precipitation. ©, 2015, Shuili Xuebao/Journal of Hydraulic Engineering. All right reserved.
引用
收藏
页码:209 / 213
相关论文
empty
未找到相关数据