Asphalt pavement construction quality evaluation model and weight calculation based on analytic hierarchy process

被引:3
作者
Zhang Y. [1 ]
Li L. [1 ]
机构
[1] Key Laboratory of Road and Traffic Engineering of the Ministry of Education, Tongji University
来源
Tongji Daxue Xuebao/Journal of Tongji University | 2011年 / 39卷 / 02期
关键词
Analytic hierarchy process; Asphalt pavement; Construction quality; Percent within limits; Weight;
D O I
10.3969/j.issn.0253-374x.2011.02.018
中图分类号
学科分类号
摘要
Upon adjusting the composition of evaluating indicators and adopting percent within limits (PWL) method to measure the quality indicator, the quality evaluation model for different layers is constructed. The weight of each quality indicators in the model is calculated with analytic hierarchy process (AHP) considering pavement performance and other factors. Model practicability is verified in one experience project.
引用
收藏
页码:253 / 258
页数:5
相关论文
共 11 条
[1]  
Li L., Guo Y., Zheng H., Et al., Study on relationship between gradation and volume parameters of asphalt mixes, Journal of Building Materials, 8, 6, (2005)
[2]  
Li L., Cao L., Guo Y., Et al., Influence of initial air void on performance of asphalt mixtures, Journal of Tongji University: Natural Science, 34, 6, (2006)
[3]  
Li L., Ma X., Influence research of gradation segregation on performance of asphalt mixture, Journal of Tongji University: Natural Science, 35, 12, (2007)
[4]  
Burati J.L., Weed R.M., Hughes C.S., Optimal procedures for quality assurance specifications, (2003)
[5]  
Hughes C.S., NCHRP Synthesis 346: State construction quality assurance programs, (2005)
[6]  
Burati J.L., Weed R.M., Hughes C.S., Et al., Evaluation of Procedures for Quality Assurance Specifications, (2004)
[7]  
Hughes C.S., What in world is PWL, Journal of the Association of Asphalt Paving Technologists, 75, (2006)
[8]  
Zhang Y., Asphalt pavement construction quality measure based on PWL, Highways & Automotive Applications, 2, (2009)
[9]  
Military standard 414, Sampling procedures for inspection by variables for percent defective, (1957)
[10]  
Research on the variation of construction and control standards of asphalt pavement, (2005)