Industrial multi-resource flexible job shop scheduling with partially necessary resources

被引:3
作者
Perrachon, Quentin [1 ,2 ]
Olteanu, Alexandru-Liviu [1 ]
Sevaux, Marc [1 ]
Frechengues, Sylvain [2 ]
Kerviche, Jean-Francois [2 ]
机构
[1] Univ Bretagne Sud, Lab STICC, UMR 6285, CNRS, Lorient, France
[2] HERAKLES, Vannes, France
关键词
Scheduling; Flexible job shop; Multi-resource; Metaheuristics; Partially necessary resources; INTEGRATED APPROACH; GENETIC ALGORITHM; TABU-SEARCH; OPTIMIZATION;
D O I
10.1016/j.ejor.2024.07.023
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper is dedicated to the study of industrial extensions of the flexible job shop scheduling problem with multiple resources in order to propose an alternative to expensive optimization software for small to medium-sized manufacturing companies. In this context, we propose a generic model able to tackle some constraints often found in industrial scheduling problems. This model tackles partially necessary resources by decomposing operations into stages. Instances are solved by a simulated annealing metaheuristic which is further improved using efficient conditions to filter non-interesting solutions. We compare our approach to a constraint programming model using a commercial solver. Extensive experiments and statistical analysis show that our method is competitive and of practical use in the industrial context.
引用
收藏
页码:309 / 327
页数:19
相关论文
共 50 条
[21]   Evolutionary algorithms for multi-objective dual-resource constrained flexible job-shop scheduling problem [J].
Yazdani, M. ;
Zandieh, M. ;
Tavakkoli-Moghaddam, R. .
OPSEARCH, 2019, 56 (03) :983-1006
[22]   Maximizing the service level on the makespan in the stochastic flexible job-shop scheduling problem [J].
Flores-Gomez, Mario ;
Borodin, Valeria ;
Dauzere-Peres, Stephane .
COMPUTERS & OPERATIONS RESEARCH, 2023, 157
[23]   MULTI-OBJECTIVE SCHEDULING SIMULATION OF FLEXIBLE JOB-SHOP BASED ON MULTI-POPULATION GENETIC ALGORITHM [J].
Zhang, W. ;
Wen, J. B. ;
Zhu, Y. C. ;
Hu, Y. .
INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2017, 16 (02) :313-321
[24]   Developing two multi-objective evolutionary algorithms for the multi-objective flexible job shop scheduling problem [J].
Rahmati, Seyed Habib A. ;
Zandieh, M. ;
Yazdani, M. .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 64 (5-8) :915-932
[25]   Robustness measures and robust scheduling for multi-objective stochastic flexible job shop scheduling problems [J].
Shen, Xiao-Ning ;
Han, Ying ;
Fu, Jing-Zhi .
SOFT COMPUTING, 2017, 21 (21) :6531-6554
[26]   A flexible job shop scheduling approach with operators for coal export terminals [J].
Burdett, Robert L. ;
Corry, Paul ;
Yarlagadda, Prasad K. D. V. ;
Eustace, Colin ;
Smith, Simon .
COMPUTERS & OPERATIONS RESEARCH, 2019, 104 :15-36
[27]   A hybrid harmony search algorithm for the flexible job shop scheduling problem [J].
Yuan, Yuan ;
Xu, Hua ;
Yang, Jiadong .
APPLIED SOFT COMPUTING, 2013, 13 (07) :3259-3272
[28]   Survey of integrated flexible job shop scheduling problems [J].
Li, Xixing ;
Guo, Xing ;
Tang, Hongtao ;
Wu, Rui ;
Wang, Lei ;
Pang, Shibao ;
Liu, Zhengchao ;
Xu, Wenxiang ;
Li, Xin .
COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 174
[29]   Flexible job shop scheduling with preventive maintenance consideration [J].
Wocker, Michael Mario ;
Ostermeier, Frederik Ferid ;
Wanninger, Tobias ;
Zwinkau, Ronny ;
Deuse, Jochen .
JOURNAL OF INTELLIGENT MANUFACTURING, 2024, 35 (04) :1517-1539
[30]   Evolutionary tabu search for flexible due-date satisfaction in fuzzy job shop scheduling [J].
Vela, Camino R. ;
Afsar, Sezin ;
Jose Palacios, Juan ;
Gonzalez-Rodriguez, Ines ;
Puente, Jorge .
COMPUTERS & OPERATIONS RESEARCH, 2020, 119