Disassembly sequence planning of steam turbines for virtual maintenance

被引:0
|
作者
Haitao, Zhu [1 ]
Liang, Cong [1 ]
机构
[1] College of Mechanical and Electrical Engineering, Harbin Engineering University, Harbin 150001, China
关键词
5;
D O I
10.4028/www.scientific.net/KEM.572.335
中图分类号
学科分类号
摘要
引用
收藏
页码:335 / 339
相关论文
共 50 条
  • [1] The disassembly model of steam turbines for virtual maintenance
    Zhu, Haitao
    Cong, Liang
    Yu, Tianyu
    2012 IEEE International Conference on Mechatronics and Automation, ICMA 2012, 2012, : 1761 - 1766
  • [2] Research on Virtual Maintenance Disassembly Sequence Planning for Weapons Equipment
    Ye Lin
    Shen Yan-an
    CONFERENCE PROCEEDINGS OF 2017 3RD IEEE INTERNATIONAL CONFERENCE ON CONTROL SCIENCE AND SYSTEMS ENGINEERING (ICCSSE), 2017, : 706 - 710
  • [3] DISASSEMBLY SEQUENCE PLANNING FOR PRODUCT MAINTENANCE
    Luo, Yongtao
    Peng, Qingjin
    PROCEEDINGS OF THE ASME INTERNATIONAL DESIGN ENGINEERING TECHNICAL CONFERENCES AND COMPUTERS AND INFORMATION IN ENGINEERING CONFERENCE, VOL 5, 2012, : 601 - 609
  • [4] A disassembly Sequence Planning Approach for maintenance
    Kheder, Maroua
    Trigui, Moez
    Aifaoui, Nizar
    ADVANCES ON MECHANICS, DESIGN ENGINEERING AND MANUFACTURING, 2017, : 81 - 89
  • [5] Optimization of disassembly sequence planning for preventive maintenance
    Maroua Kheder
    Moez Trigui
    Nizar Aifaoui
    The International Journal of Advanced Manufacturing Technology, 2017, 90 : 1337 - 1349
  • [6] Optimization of disassembly sequence planning for preventive maintenance
    Kheder, Maroua
    Trigui, Moez
    Aifaoui, Nizar
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2017, 90 (5-8): : 1337 - 1349
  • [7] Research on Disassembly Sequence Planning Method for Maintenance
    Xu, Xiaohui
    Yang, Xiaoyu
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON MECHATRONICS, ELECTRONIC, INDUSTRIAL AND CONTROL ENGINEERING, 2015, 8 : 142 - 145
  • [8] Disassembly sequence planning for maintenance based on metaheuristic method
    Lu Zhong
    Sun Youchao
    Gabriel, Okafor Ekene
    Wu Haiqiao
    AIRCRAFT ENGINEERING AND AEROSPACE TECHNOLOGY, 2011, 83 (03): : 138 - 145
  • [9] Disassembly sequence planning approach for product virtual maintenance based on improved max–min ant system
    Xinhua Liu
    Gaoliang Peng
    Xiumei Liu
    Youfu Hou
    The International Journal of Advanced Manufacturing Technology, 2012, 59 : 829 - 839
  • [10] Disassembly sequence planning approach for product virtual maintenance based on improved max-min ant system
    Liu, Xinhua
    Peng, Gaoliang
    Liu, Xiumei
    Hou, Youfu
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 59 (5-8): : 829 - 839