Multi-project scheduling using an heuristic and a genetic algorithm
被引:0
作者:
Kumanan, S.
论文数: 0引用数: 0
h-index: 0
机构:
Department of Production Engineering, National Institute of Technology, Tiruchirappalli 620015, IndiaDepartment of Production Engineering, National Institute of Technology, Tiruchirappalli 620015, India
Kumanan, S.
[1
]
Jegan Jose, G.
论文数: 0引用数: 0
h-index: 0
机构:
Department of Production Engineering, National Institute of Technology, Tiruchirappalli 620015, IndiaDepartment of Production Engineering, National Institute of Technology, Tiruchirappalli 620015, India
Jegan Jose, G.
[1
]
Raja, K.
论文数: 0引用数: 0
h-index: 0
机构:
Department of Production Engineering, National Institute of Technology, Tiruchirappalli 620015, IndiaDepartment of Production Engineering, National Institute of Technology, Tiruchirappalli 620015, India
Raja, K.
[1
]
机构:
[1] Department of Production Engineering, National Institute of Technology, Tiruchirappalli 620015, India
来源:
International Journal of Advanced Manufacturing Technology
|
2006年
/
31卷
/
3-4期